DEVB TC(W) No. 3/2023, Annex A 5(12)(e)
Tower crane monitoring: lifting zone alert for people under the hook
Clause 5(12)(e) of DEVB TC(W) No. 3/2023, Annex A, requires an automated warning system on all tower cranes. It protects people in the loading and unloading zone, generally at least 7 m radius from the hook, from the moving load. A person entering triggers a cab warning, a siren of at least 100 dB on the hook and an alert. Kodifly fits and runs it.
Last updated
What the circular requires, and where it is mandatory
The circular asks for an automated warning system on all tower cranes operating on site. It alerts the crane operator, and anyone who steps into the loading and unloading danger zone, of the risk of being hit by the moving load under the hook (clause 5(12)(e)). The Safety Officer sets the zone by risk assessment. The Buildings Department and CIC name it the unsafe acts and dangerous situation alert for the tower crane lifting zone.
On a Hong Kong high-rise, the zone moves up the building with the works, so sensors must cover loading and unloading areas at every floor level involved. The Buildings Department also requires the 4S Tower Crane Alert System on private building works above HK$30 million that use tower cranes, as a condition imposed since July 2024 (LCQ13, 24 June 2026).
Requirements in Annex A, clause 5(12)(e), tower crane
| Topic | Requirement |
|---|---|
| Scope | All tower cranes operating on site. |
| Sensor cover | Enough sensors on or around the crane for full cover of the loading and unloading danger zone at all floor levels involved. |
| Danger zone | Set by the Safety Officer from the risk assessment. In general not less than 7 m radius from the crane hook. |
| Clearance trigger | The system activates when the clearance between cargo and the loading or unloading area is below a minimum set by the Safety Officer, in general not less than 3 m, and a sensor detects a person in the zone. |
| In the cab | A warning light on the dashboard and a spoken message telling the operator to stop all crane motion. |
| At the hook | A siren speaker on the hook with flashing red light and continuous warning of at least 100 dB. It switches off when the person leaves the zone. |
| Alert message | SMS or in-app pop-up to site supervisors and the Safety Officer, recorded at the platform with the date and time of the encroachment. |
| Video clip | Required in the alert message: a clip from 15 seconds before the encroachment to 10 seconds after the person leaves (clause 5(12)(e)(ii)). |
| Contract variants | Some contract specifications say the danger zone is in no case less than 7 m and the clearance in no case less than 3 m, making both hard minimums. |
When someone is under the load
Lift
The load comes within the set clearance of the loading or unloading area.
Detect
A sensor sees a person inside the danger zone.
Stop the crane
A dashboard light flashes and a spoken message tells the operator to stop all motion.
Warn
The siren on the hook sounds at 100 dB or more with a flashing red light.
Alert and clear
Supervisors and the Safety Officer are alerted. Signals switch off when the person leaves.
What some contract specifications add
Compliance matrices for recent Hong Kong public works list these beside the tower crane clause. Kodifly meets each.
Crane duties
- A hook-view camera, a load-radius indicator and an in-cab monitor.
- Geofencing that keeps the travel path out of the lifting zone.
- A battery and power package, including solar charging, for continuous crane operation.
- API links to the tower crane camera and anti-collision systems in common use in Hong Kong.
How Kodifly supplies, installs and runs it
Sensors, cab unit, hook siren and platform link are fitted to each crane as one project.
Devices, software and installation together
Sensors on and around each tower crane
Cab light and spoken warning for the operator
Hook siren and flashing red light
Danger zone and clearance set with the Safety Officer
Cover moved as floors are added
Alerts to supervisors and the Safety Officer
Event record on the platform
Tower crane monitoring, answered
What does the circular require for tower cranes?
An automated warning system on all tower cranes that protects people in the loading and unloading zone from the moving load, with a cab warning, a hook siren of at least 100 dB and an alert to supervisors (Annex A, clause 5(12)(e)).
How large is the lifting danger zone?
The Safety Officer decides it from the risk assessment. In general it is not less than 7 m radius from the crane hook (clause 5(12)(e)). Some contract specifications say in no case less than 7 m.
What is the 3 m clearance?
It is the minimum clearance between the cargo and the loading or unloading area at which the system activates when a person is in the zone. The Safety Officer sets it, and in general it is not less than 3 m (clause 5(12)(e)).
Where does the siren sit?
On the crane hook, with a flashing red light and a continuous warning of at least 100 dB. It switches off automatically when the person leaves the danger zone (clause 5(12)(e)).
Is a video clip required?
Yes. The alert message includes a video clip from 15 seconds before the encroachment until 10 seconds after the person leaves the danger zone (clause 5(12)(e)(ii)). Kodifly attaches it to every alert.
Is it mandatory on private building works?
Yes for building works above HK$30 million that use tower cranes. The Buildings Department has imposed the 4S Tower Crane Alert System as a condition since July 2024 (LCQ13, 24 June 2026).
Is a lifting permit also needed?
The sample permit-to-work covers lifting operations by tower cranes, with a narrow exclusion for light loads near the crane edge (clause 5(12)(c)(i)). The two systems work side by side.
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
- Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
- Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.