LiDAR sensing for sites and public assets
Kodifly captures sites and assets with LiDAR in three ways, fixed-point units on poles and structures, drones on a set route, and handheld scanners, and feeds every scan into the same dated record that the AI compares.
Three ways to capture
Fixed
Fixed-point LiDAR
ScanStation K4DL-1000 watches the same ground day and night from a pole, tower crane or other fixed structure.
Aerial
Fixed-route drone LiDAR
Drone LiDAR flown on a set route fills the blind spots that a fixed unit cannot see.
Handheld
Handheld LiDAR
Walk the site with a handheld scanner and the scan lands on the plan with the date.
Accuracy classes by device
Each accuracy figure means something different. Range accuracy is the sensor's own repeatability. Absolute accuracy is the delivered point cloud checked against survey control.
| Device or deliverable | Accuracy class | Measured as |
|---|---|---|
| ScanStation K4DL-1000 (fixed-point) | ±2 cm (1σ) | Range accuracy of the LiDAR sensor |
| Terrestrial laser scanning | ±2 mm at 10 m | Range accuracy for survey-grade as-built and design checks |
| Co-supervision Platform capture (fixed-point, fixed-route and handheld) | 8 cm or better absolute | RMSE against at least 10 RTK checkpoints, checked by a qualified surveyor (CSP Particular Specification A1 1.1(f)) |
ScanStation K4DL-1000 at a glance
Values as published by Kodifly. A full datasheet is available on request.
- Range accuracy
- ±2 cm (1σ)
- Output
- Real-time colourised point clouds
- Georeferencing
- Centimetre-level
- Ingress protection
- IP65
Where LiDAR sensing is used
LiDAR sensing questions
What does fixed-point capture mean?
The LiDAR stays in one place, on a pole, tower crane or other non-movable object, and observes the same area repeatedly. Because the unit is fixed in place, every scan is directly comparable with the one before it.
When is drone LiDAR used with a fixed unit?
Where a fixed unit has blind spots, drone LiDAR flown on a set route fills them. The two are planned together for a site.
Can we measure from the point cloud?
Yes. Distances and areas are taken straight from the scan, so nobody goes back to site with a tape.
Is ScanStation weatherproof?
Yes. It has an IP65 housing for site conditions and watches the same ground day and night. ScanStation is made by Kodifly and installed by our own engineers.
What happens to a scan after capture?
Every scan feeds the same dated record as your walks and drone flights. The AI compares each scan with the last, and a report is drafted for your engineers to review.
Where can I get the full datasheet?
Ask us through the contact page and we will send it.
Plan LiDAR for your asset
Tell us the site and what must be watched. We will advise where fixed units and drone routes should cover.