Skip to content
Kodifly
Book a demo

Singapore

Every Singapore site requirement, on one platform

Kodifly delivers the technology behind Singapore's construction requirements, BCA virtual inspection and IDD, MOM video surveillance and e-PTW, JTC precast tracking and reality capture, remote site supervision, ground monitoring and facade inspection. One SpatialSense record runs behind all of them, so you buy once and every agency sees the same evidence.

9
Singapore requirements, delivered complete.
100+
sites run Kodifly systems across Asia and the Middle East.
Live
on Singapore sites today.

Pick your requirement

Each page shows what Kodifly delivers and how it runs on site.

One record, every agency.

BCA, MOM and JTC each ask for evidence in their own way. SpatialSense keeps one dated record of the site and shows each of them what it needs. You do not run six vendors, six logins and six sets of records.

See SpatialSense

Singapore

A local team, backed by 100+ sites.

Kodifly has a Singapore entity alongside Hong Kong and Saudi Arabia, so you work with a local company in your own time zone.

  • Hong KongHeadquarters

    Engineering, product and AI, based at Hong Kong Science Park.

  • SingaporeSoutheast Asia

    Our Singapore entity, serving clients across Southeast Asia.

Contact the team

Singapore questions

Which Singapore requirements does Kodifly cover?

BCA virtual inspection, Integrated Digital Delivery and remote site supervision, MOM video surveillance and e-PTW with vehicular safety technology, JTC precast and logistics tracking and reality capture, ground and railway protection monitoring, and facade inspection.

Why one platform for all of them?

The evidence is the same site. One dated record of walks, flights, scans, permits and cameras serves every agency, so there is nothing to reconcile and one team to call.

Is there funding for Singapore firms?

BCA's BETC grant supports IDD digital solutions for Singapore-registered firms, and eligible SMEs can use the Productivity Solutions Grant for pre-scoped VSS with AI packages. Apply before you sign or pay. The IDD page has the rates.

Do you work in Hong Kong too?

Yes. The same platform runs Hong Kong public works requirements, including the DWSS, 4S and body-worn cameras.

Show us the requirement

Tell us the project and the rule you are working to. We will show you the system on your own site.