Skip to content
Kodifly
Get a sample AI report

Industries

AI for urban management and public safety

Kodifly's computer vision, drone mapping and dated records help city and public bodies inspect street-level assets, signage and public estates at scale, and keep the evidence for every finding.

A Kodifly LiDAR unit on a pole beside a flyover and a public housing estate

What the AI does in the city

  • Signboard detection

    Computer vision finds and logs signboards from imagery, so inspectors review a list instead of searching every street.

  • Drone survey and mapping

    Drone flights give a dated model of an estate or site, compared from one flight to the next.

  • Intrusion and perimeter watch

    AI detection flags people or objects entering a defined zone, with a dated record.

  • A searchable record

    Findings, photos and inspections are held on a map and can be searched in plain language.

Review findings, not footage.

The AI tags what it finds and places it on the map. Your officers review the list, confirm what matters and keep the dated evidence.

  • Every finding has a date and a position.
  • Reports are drafted by the AI and reviewed by your team.
  • Works with 360 cameras, drones and fixed LiDAR.

Explore SpatialSense

AI tags objects in a 360 capture and lists them in the Annotations and issues panel

From imagery to a reviewed finding.

  1. Capture

    360 cameras, drones and fixed LiDAR record street-level assets and estates. Each capture is dated and placed on the map.

  2. Tag

    The AI tags what it finds, such as signboards, and places it on the map.

  3. Review

    Your officers review the list and confirm what matters.

  4. Report

    The AI drafts the report for your team to review, and each finding keeps its dated evidence.

Urban management questions

What can the AI detect?

Objects and conditions in images, such as signboards or people entering a defined zone. Describe the assets you inspect and we will show how the AI would handle them.

Does the AI decide what gets reported?

No. The AI tags what it finds and drafts the report. Your officers review the list and confirm what matters, and your team reviews the report.

What evidence is kept for each finding?

Every finding has a date and a position, and the images are kept as evidence.

How is an estate compared over time?

Drone flights give a dated model of the estate, and each model is compared with the one from the flight before.

Can we search past findings?

Yes. Findings, photos and inspections are held on a map and can be searched in plain language.

Which capture devices does it work with?

360 cameras, drones and fixed LiDAR. The fixed LiDAR is ScanStation, made by Kodifly and installed by our own engineers. For 360 cameras, SpatialSense works with the Insta360 X4, X5 and X6 and the DJI Osmo 360.

Tell us what you inspect

Describe the assets, the area and how often you inspect. We will show how the AI would handle it.