Skip to content
Kodifly
Get a sample AI report

Capabilities

Always-on monitoring with dated alerts

Kodifly's fixed LiDAR and AI watch the same ground day and night, compare each scan with the last and raise an alert tied to a dated measurement, so change is seen overnight rather than at the next visit.

From a scan to an alert.

  1. Watch

    A fixed unit scans the same area on a schedule, day and night.

  2. Compare

    The AI lines up each scan with the last and measures the change.

  3. Alert

    When change crosses a threshold, the right person is told, with the measurement attached.

  4. Record

    The alert and its evidence are kept in the dated record.

The same view every day, in any light.

ScanStation is weatherproof and fixed in place, so every scan is directly comparable with the one before it.

  • IP65 housing.
  • Change detected overnight.
  • Made by Kodifly and installed by our own engineers.

Explore ScanStation

Same view every day
Change detected overnight
A Kodifly LiDAR and camera unit on a pan-tilt head, facing a hillside works site

Where monitoring is used

What can be watched

  • Slope gradient

    Software tracks the gradient of a slope over time from LiDAR scans and flags change.

  • Flexible barriers

    Flexible barriers on hillsides are monitored, so movement or loading is recorded with a date.

  • Excavation volume

    The volume of excavation and earthworks is monitored from repeated scans.

  • Vegetation and tree intrusion

    LiDAR measures how close trees and growth are to a rail line and flags the spots that need clearing.

  • Landslide detection

    The AI watches slopes beside the track for movement and raises an alert with the dated evidence.

  • Intrusion detection

    AI detection flags people or objects entering a defined zone, with a dated record of the event.

Monitoring questions

Does monitoring continue at night?

Yes. A fixed ScanStation unit watches the same ground day and night and gives the same view in any light, so change is seen overnight rather than at the next visit.

What if a fixed unit cannot see the whole site?

Drone LiDAR flown on a set route fills the blind spots. Fixed units and drone routes are planned together for a site.

What comes with an alert?

The measurement that triggered it. Every alert is tied to a dated measurement, and the alert and its evidence are kept in the dated record.

Who reviews the findings?

Your own engineers. Findings go into one dated record, and the AI drafts a report for them to review.

Who installs and supports the units?

ScanStation is made by Kodifly. Our own engineers install and support it on site, and stay with the project after go-live.

Tell us what must be watched

Describe the site, the risk and who needs the alerts. We will advise on placement.