JTC IDDTA and BCA DfMA
Precast and PPVC tracking, from shop drawing to installation
Kodifly tracks every precast and PPVC element through shop drawing approval, fabrication, delivery and installation on one dashboard. Production status, delivery and installation sign-off update as they happen, and non-conformances are raised and closed in the same record. Live on a Singapore project.
- Stages tracked
- Shop drawing, fabrication, delivery, installation
- Asked for by
- JTC, as a certified technology category
- Also relevant to
- BCA Government Land Sales sites using DfMA
- Live
- on a Singapore precast project today.
- 4
- stages tracked, from shop drawing to installation.
- 1
- dashboard for the factory, the haulier and the site.
Every stage of the element's life, tracked.
9 of 9 included
Production schedule planning
Shop drawing approval status
Fabrication progress at the factory
Delivery and logistics status
Installation tracking on site
Installation sign-off
Non-conformance reports
Dated photos at each stage
Dashboard by element, level and block
Follow an element from drawing to wall.
Approved
The shop drawing is approved and the element is scheduled.
Made
Fabrication status updates at the factory.
Delivered
Dispatch and arrival are recorded against the element.
Installed
Installation is photographed and signed off on site.
See what is late before the crane does.
Planned against actual for every element. A late drawing, a short delivery or an unfinished installation shows up on the dashboard before it holds up the lift. Non-conformances are raised with a photo and closed in the same record.
Proven on real sites.
- 100+
- sites run Kodifly systems across Asia and the Middle East.
- ~20
- Hong Kong public works contracts run SmartEye on Kodifly sensors.
- Gold
- CIC AI Award 2026 for SmartEye, the platform Kodifly supplies sensors for.
Where precast tracking is asked for
BCA
Government Land Sales sites
GLS sites adopt DfMA, including precast and PPVC, and show at least five IDD use cases.
Precast tracking questions
What is digital precast and logistics tracking?
It follows each precast or PPVC element from shop drawing approval through fabrication and delivery to installation, so planners see status without calling the yard. JTC describes it as digital tracking of production, delivery and installation across the building lifecycle.
Does Kodifly deliver it?
Yes. Kodifly tracks production, delivery and installation on SpatialSense, with installation sign-off and non-conformance reports. It is live on a Singapore project now.
Is precast tracking mandatory in Singapore?
JTC certifies vendors in this category for its projects, and BCA requires Government Land Sales sites to adopt DfMA, such as PPVC and advanced precast systems, and to show at least five IDD use cases. On other projects the client or main contractor decides.
Which elements can it track?
Precast components and PPVC modules, each with its own record, from the first drawing to the installed element.
Who updates it?
The factory, the haulier and the site team work in the same record, each updating the stage they own.
Does it connect to our common data environment?
SpatialSense offers API access, and Kodifly builds the link to your project's data environment, including JTC's OPTIMUS on JTC projects.
Track your next precast package
Tell us the elements, the factory and the site. We will show the dashboard on your own schedule.


