Skip to content
Kodifly
Book a demo

MOM WSH requirements

Digital permit to work system (e-PTW) and vehicular safety for MOM projects

A digital permit to work system (e-PTW) raises, approves, tracks and closes permits for high-risk work online. From 1 April 2024, public-sector construction tenders of S$3 million and above must adopt an electronic permit-to-work system and vehicular safety technology. Kodifly delivers both complete on one dashboard, with e-PTW on SpatialSense, plus proximity warning, in-cab cameras and driver-fatigue detection for site vehicles.

Applies to
Public-sector projects of S$3 million and above
Tenders called
On or after 1 April 2024
Workheads
BCA CW01, CW02, ME and CR
Both required
e-PTW and vehicular safety technology
3
S$ million: public-sector projects at or above this adopt both technologies.
2
technologies required, e-PTW and vehicular safety.
1
dashboard for permits, vehicles and cameras.

MOM's mature WSH technology, complete.

9 of 9 included

  • Electronic permit-to-work

  • Permits raised and approved on site

  • Approval in order, no skipping

  • Expiry alerts and revocation

  • Live, closed and in-review dashboard

  • Five-year records, PDF and Excel

  • Proximity warning for people near plant

  • In-cab camera for blind areas

  • Driver-fatigue and distraction detection

How permit-to-work runs.

  1. Raised on site

    Created where the work happens, with the location captured.

  2. Approved in order

    Approval runs in sequence, and only authorised people sign.

  3. Watched while open

    Alerts before a permit lapses, and a supervisor can revoke it.

  4. Seen at a glance

    Every permit on one dashboard, live, closed or in review.

One screen for permits, vehicles and cameras.

Open permits show beside vehicle alerts and camera events, so a supervisor sees conflicting works and a plant too close to workers in the same place. Fatigue and proximity alerts go to the operator and the supervisor in real time.

See the full product

Proven on real sites.

100+
sites run Kodifly systems across Asia and the Middle East.
~20
Hong Kong public works contracts run SmartEye on Kodifly sensors.
Gold
CIC AI Award 2026 for SmartEye, the platform Kodifly supplies sensors for.

The same permit-to-work, and more

e-PTW and vehicular safety questions

What is a digital permit to work system (e-PTW)?

A digital, or electronic, permit to work system raises, approves, tracks and closes permits for high-risk work online instead of on paper. MOM requires one on public-sector construction projects of S$3 million and above, alongside vehicular safety technology.

Who must adopt it?

Main contractors on public-sector construction and construction-related projects of S$3 million and above, under BCA workheads CW01, CW02, ME and CR, for tenders called on or after 1 April 2024.

What is vehicular safety technology?

Technology that detects and manages driver or operator fatigue and reduces collisions and accidents. MOM's template has three parts, proximity sensing and warning, a camera monitor system for blind areas, and driver-fatigue management.

Does Kodifly meet all of MOM's mature WSH technology requirement?

Yes. Kodifly delivers the e-PTW on SpatialSense and all three vehicular safety parts, proximity warning, in-cab cameras and driver-fatigue detection, on the same dashboard, with training and maintenance.

How long are permit records kept?

For at least five years from creation. Approved permits cannot be edited, and each one can be exported to PDF or Excel for an MOM inspection.

What does MOM ask for on video surveillance?

A separate rule covers every construction site of S$5 million and above, public or private. Kodifly delivers AI cameras and keeps the footage in the site record.

Does the same permit-to-work work in Hong Kong?

Yes. Hong Kong's Smart Site Safety System also asks for a digitised permit-to-work for high-risk activities, and SpatialSense delivers it for both.

See permit-to-work on your own site

Tell us the project and the permits you run. We will show SpatialSense against them.