Technology for JTC projects: precast tracking, 360 capture and drone, on one platform

JTC certifies digital solutions for its projects in four use cases, precast and logistics tracking, 360 capture at ground level, drone quality and defect inspection, and drone site-wide progress and survey. Kodifly delivers all four on one SpatialSense record, built to connect to JTC's OPTIMUS Connected Data Environment, together with two JTC Robotic and Automation items, LiDAR-based design validation during construction and virtual TOP/CSC inspection.

Programme
JTC Integrated Digital Delivery Technology Alliance
Use cases
Four
Data platform
OPTIMUS, JTC's Connected Data Environment
Robotic and Automation items
LiDAR-based design validation during construction; virtual TOP/CSC inspection
4
JTC use cases, all delivered by Kodifly.
1
platform, one record, one login.
Live
on a Singapore precast project today.

Every JTC use case, covered.

8 of 8 included

  • Digital precast and logistics tracking

  • 360 reality capture at ground level

  • Drone quality and defect inspection

  • Drone site-wide progress and survey

  • LiDAR-based design validation during construction

  • Virtual TOP/CSC inspection to the 360 checklist

  • Issues followed through to resolution

  • Connected to OPTIMUS

How we work with a JTC contractor.

  1. Pick the use case

    Start with the one your contract names. Add the rest when you are ready.

  2. Set up on your project

    Your plans, schedule and elements go in. No new tools for the site team.

  3. Connect the data

    Project data flows to the data environment your JTC team uses.

  4. Show the result

    Progress, quality and safety evidence, dated and ready to review.

The four use cases, delivered

Working on a JTC project?

Book a demo

JTC Robotic and Automation items, delivered

JTC building contracts list Robotic and Automation items alongside the IDDTA use cases. Kodifly delivers the two that run on reality capture.

  • Robotic and Automation

    LiDAR-based design validation during construction

    A terrestrial scanner at ±2 mm over 10 m and at least 1 million points per second. Deviation reports against the BIM model before backfilling, patching, closing formwork or boxing-up, to a target of no more than 10 mm.

  • Robotic and Automation

    Virtual TOP/CSC inspection

    Full compliance with the 360 Virtual Inspection Checklist (Industrial) Version 1.0, evidence tagged to each clause, and support for the QP until BCA accepts the Virtual Inspection Plan.

Proven on real sites.

100+
sites run Kodifly systems across Asia and the Middle East.
~20
Hong Kong public works contracts run SmartEye on Kodifly sensors.
Gold
CIC AI Award 2026 for SmartEye, the platform Kodifly supplies sensors for.

Design validation from the scan.

The scan is compared with the BIM model at a stated tolerance, zone by zone and element by element. Deviations go into a report before the work is covered.

JTC project questions

What is JTC's IDDTA?

The Integrated Digital Delivery Technology Alliance is JTC's programme to certify digital construction solutions for use on its projects. Certified solutions meet JTC's standards and connect to OPTIMUS, its Connected Data Environment. Certificates last two years from the award date.

Which use cases does JTC certify?

Four. Digital precast and logistics tracking, 360 reality capture at ground level, aerial reality capture for quality and defect inspection, and aerial reality capture for site-wide progress and survey monitoring. JTC says more will follow.

Does Kodifly cover JTC's use cases?

Yes. Kodifly delivers precast and logistics tracking, 360 capture, drone inspection and drone progress and survey on SpatialSense, and is live on a Singapore precast project.

Which JTC Robotic and Automation items does Kodifly deliver?

Two. LiDAR-based design validation during construction: deviation reports that compare the point cloud with the BIM model for M&E underground and embedded services and RC wall and beam penetrations, before the work is covered, to a target of no more than 10 mm. Virtual TOP/CSC inspection: full compliance with the 360 Virtual Inspection Checklist (Industrial) Version 1.0, with support for the QP until BCA acceptance.

Why use one platform for all four?

One record holds the precast schedule, the 360 walks, the drone captures and the defects. JTC reviews see one story, and your team learns one system.

What does the 360 capture cover?

Progress tracking across phases, quality inspection and defect management, safety hazards, and site documentation for handover or disputes. Each capture sits on the floor plan with its date.

Working on a JTC project?

Tell us the use case and the project stage. We will show it on your own data.