Skip to content
Kodifly
Get a sample AI report

Industries

Monitor slopes and the environment with AI

Kodifly's LiDAR and software monitor slope gradient, flexible barriers, excavation volume and environmental readings, and tie every alert to a dated measurement, so public bodies can show what moved, when and by how much.

A Kodifly LiDAR unit and equipment cabinet on a pole above a protected hillside, with technicians at work

What we monitor

  • Slope gradient

    Software that tracks the gradient of a slope over time from LiDAR scans and flags change. On the Co-supervision Platform this is the slope angles and ground profile measurement function, TC(W) No. 1/2026 Annex A, paragraph 5(iii).

  • Soil nail heads

    Each soil nail head located in a fixed-point time series and compared with its first position, so displacement is logged by date and raised as an alert.

  • Rock anchors

    Rock anchor heads and the rock face around them tracked against their baseline from the same fixed-point record.

  • Flexible barriers

    Monitoring of flexible barriers on hillsides, so movement or loading is recorded with a date.

  • Excavation volume

    Volume monitoring of excavation and earthworks from repeated scans.

  • Environmental readings

    Environmental monitoring brought onto the same dashboard as the site record.

A fixed unit above the hillside.

A ScanStation LiDAR unit and equipment cabinet on a pole watches the slope day and night. Each scan is compared with the last and the change is logged.

  • Centimetre-level georeferencing.
  • Alerts tied to dated measurements.
  • Installed and supported by Kodifly engineers.

Explore ScanStation

A point cloud of a hillside site with two distances measured on screen

Track record on slopes and environment

Slope and environmental work we have delivered for Hong Kong government departments, by scope.

DepartmentScope
CEDDSlope gradient monitoring software
DSDEnvironmental monitoring and excavation-volume software
GEOFlexible barrier monitoring

Insights

News and notes from Kodifly on slope and environmental monitoring.

Show us the slope

Tell us the site, the risk and who needs the alerts. We will show how a dated record would work for it.