Industries
Monitor public assets and facilities with AI
Kodifly's fixed-point LiDAR and AI keep a dated 3D record of plants, pumping stations, tunnels and other facilities, so asset owners can see change, detect intrusion and check conditions without sending a team every time.

What the AI does on a facility
Watches the same view every day
A ScanStation LiDAR unit on a pole or structure scans the same area day and night and compares each scan with the last.
Detects intrusion
AI detection flags people or objects entering a defined zone, with a dated record of the event.
Monitors specific operations
AI use cases built around a facility's own process, such as monitoring of welding work.
Keeps the record in one place
Findings, inspections and alerts sit in one dated record that your team can search and report from.
Hardware and software
One record from sensor to report.
LiDAR and cameras capture the asset, the AI reads the change, and SpatialSense holds the dated evidence and drafts the report for your engineers to review.
- Centimetre-level georeferenced point clouds.
- Weatherproof hardware made by Kodifly and installed by our own engineers.
- Alerts tied to a dated measurement, not a guess.

Track record on facilities
Facilities work we have delivered for Hong Kong government departments, by scope.
| Department | Scope |
|---|---|
| EMSD | Fixed-point LiDAR |
From a scan to a report.
Watch
A fixed ScanStation unit scans the same area day and night. Drone LiDAR covers what a fixed unit cannot see.
Compare
The AI lines up each scan with the last and measures the change.
Alert
When change crosses a threshold, the right person gets an alert with the dated measurement attached.
Report
Findings go into one dated record, and SpatialSense drafts the report for your engineers to review.
Facility monitoring questions
Which facilities is it used for?
Plants, pumping stations, tunnels and other facilities. Fixed LiDAR and AI watch them and keep a dated record of every change.
Where is the unit mounted?
On a pole or other fixed structure at the facility. Tell us what must be watched and we will advise where fixed units and drone routes should cover.
Is the hardware weatherproof?
Yes. ScanStation has an IP65 housing. It is made by Kodifly and installed and supported by our own engineers.
Can the AI watch a specific operation?
Kodifly builds AI use cases around a facility's own process, such as monitoring of welding work. Tell us the operation and we will show how it would work.
Does this replace site visits?
It means you do not have to send a team every time. Asset owners can see change, detect intrusion and check conditions from the dated record.
Show us the asset
Tell us the facility and what must be watched. We will show how a dated record would work for it.
