BCA Periodic Facade Inspection
Drone and AI facade inspection for Periodic Facade Inspection
Singapore buildings over 13 metres tall and 20 years old need a facade inspection every seven years. Kodifly plans the drone capture of the whole facade, flags cracks, spalling, stains and other visible defects with AI, masks images of residents and gives your Competent Person a dated, located report pack to review.

- Applies to
- Buildings over 13 m tall and 20 years old
- Every
- Seven years
- In force
- 1 January 2022
- Exempt
- Landed houses and temporary buildings
- 7
- years between facade inspections.
- 13 m
- building height above which it applies, once 20 years old.
- AI
- defect detection and resident masking in one pass.
From flight to Competent Person report.
8 of 8 included
Whole-facade drone capture
Close-range defect imagery
AI defect detection
Defects located on the elevation
Images of residents masked
Dated records for the seven-year cycle
Review pack for the Competent Person
Rectification follow-up
Every seven years, in four steps.
Notify
The Competent Person notifies BCA, and occupants get notice.
Fly
Every elevation is flown by an accredited drone operator, as BCA requires, with close-ups where needed.
Detect
AI flags defects and masks people, and each finding is located.
Review
The Competent Person reviews the pack and proposes rectification.
Review findings, not hours of footage.
Each defect is pinned on the elevation with its image and date, so the Competent Person goes straight to what matters. Rectification is tracked in the same record until it is closed.
Proven on real sites.
- 100+
- sites run Kodifly systems across Asia and the Middle East.
- ~20
- Hong Kong public works contracts run SmartEye on Kodifly sensors.
- Gold
- CIC AI Award 2026 for SmartEye, the platform Kodifly supplies sensors for.
Drone capture, put to work
Facade inspection questions
Who needs a Periodic Facade Inspection?
Owners of buildings more than 13 metres tall once they are more than 20 years old, every seven years, from 1 January 2022. Landed houses and temporary buildings are exempt. The owner appoints a Competent Person, who is a Professional Engineer or Registered Architect with a Certificate in Facade Inspection.
Can drones be used?
Yes. BCA allows drones for the visual inspection when an accredited unmanned aircraft system service provider operates them and the Competent Person notifies BCA first. The Competent Person, or a supervised Facade Inspector, must be present and must personally review all outputs.
Does Kodifly deliver drone and AI facade inspection?
Yes. Kodifly plans the capture, runs the AI defect detection and resident masking, and prepares the report pack for your Competent Person to review. Flights are made by an accredited drone service provider, as BCA requires.
What about residents' privacy?
BCA's technical reference asks for images of residents to be anonymised, for example by masking, and for at least three days' notice to occupants. Kodifly masks people in the report images.
Why use a drone?
There is no gondola and no work at height. BCA says drones make inspection safer, more efficient and less labour intensive.
Inspect the facade from the ground
Tell us the building and its age. We will show you the drone plan and a sample defect report.


