Skip to content
Kodifly
Get a sample AI report

Industries

Watch rail and transport corridors with AI

Kodifly's LiDAR and AI monitor rail and transport corridors for tree intrusion, vegetation, landslide risk and change, and raise alerts tied to dated measurements, so operators act on evidence rather than waiting for the next inspection.

A drone capture of a road under construction

What the AI does along a corridor

  • Vegetation and tree intrusion

    LiDAR measures how close trees and growth are to the line and flags the spots that need clearing.

  • Landslide detection

    AI watches slopes beside the track for movement and raises an alert with the dated evidence.

  • Alerts from moving equipment

    LiDAR carried on rolling stock turns each run into a measurement that can be compared with the last.

From a corridor run to an alert.

  1. Capture

    Fixed LiDAR, drone flights or equipment-mounted sensors record the corridor, each capture dated and placed on the map.

  2. Compare

    The AI lines up the same position on two dates and lists what changed.

  3. Alert

    When change crosses a threshold, the right person gets an alert tied to the measurement.

  4. Report

    Findings go into one dated record and a report drafted for your engineers to review.

Always-on where a walk is not safe or practical.

A fixed ScanStation unit watches the same ground day and night, so change is seen overnight rather than at the next visit.

  • Weatherproof hardware made by Kodifly.
  • The same view in any light.
  • Drone LiDAR fills any blind spots.

Explore ScanStation

A Kodifly LiDAR unit and equipment cabinet on a pole above a protected hillside, with technicians at work

Insights

News and notes from Kodifly on rail and transport corridors.

Tell us the corridor

Describe the line, the risk and what you need to evidence. We will show how a dated record would work for it.