Skip to content
Kodifly
Get a sample AI report

Capabilities

A dated digital twin of any asset

Kodifly places every walk, flight and scan on the plan with its date, so an asset has one record that can be compared over time, overlaid with its BIM model and searched in plain language.

Every capture has a date and a place.

360 walks, drone flights and LiDAR scans land on the floor plan or map, so you can open the same position on two dates and see the change.

  • Two dates compared side by side.
  • Point clouds measured on screen.
  • Findings and issues pinned where they were found.
A point cloud of a hillside site with two distances measured on screen

What the record includes

  • BIM overlay

    Compare what is built against the model, with the date of the capture.

  • Drone models over time

    Drone models of the same area, compared from one flight to the next.

  • Point clouds

    Colourised, georeferenced LiDAR scans that can be measured and compared.

Where digital twins are used

How the record is built

One dated record, from capture to report.

  1. Capture

    Walk with a 360 helmet camera, fly a drone, scan with handheld LiDAR or mount a ScanStation. Every capture is dated and placed on the plan.

  2. Compare

    Open any two dates next to each other. The AI lines up the same position and lists what changed.

  3. Keep

    Findings, issues and inspections live in one dated record, pinned where they were found.

  4. Report

    The AI drafts the report for your experts to review, and you can ask the record questions in plain language.

Digital twin questions

What can go into the record?

360 walks, drone flights and LiDAR scans, whether handheld or from a fixed ScanStation. Each capture lands on the floor plan or map with its date.

Can we measure from the record?

Yes. Distances and areas are taken straight from the point cloud on screen, so nobody goes back to site with a tape.

How is the BIM model used?

Lay the 360 capture next to the BIM view of the same space and spot where the two disagree. The comparison keeps the date of the capture.

What happens to the record after works are covered?

It is still there. Each capture keeps its date and position, so you can open what was on record before a pour or a ceiling covered it.

How do we find something in the record?

Search it in plain language and get a short summary with links to the source.

See your asset as a dated record

Send two walks of the same site and we will return a sample AI report.