BCA IDD and site records
Integrated Digital Delivery (IDD) and site records for Singapore
Inspection records, progress capture and BIM comparison in one system. Kodifly delivers BCA's IDD use cases for progress monitoring, inspection follow-up, defect tracking and BIM viewing, and the site records the Building Control Regulations ask for. Live on Singapore sites.
- 5
- IDD use cases Government Land Sales sites must show.
- 19
- essential IDD use cases BCA lists for reference.
- 70%
- BETC grant cap for SMEs, to 31 March 2027.
Everything on site, in one record.
8 of 8 included
Digital progress monitoring
Inspection observations and follow-up
Defect tracking
BIM and 3D viewing
Site record book
Inspection and approval before concreting
Dated photos, searchable
Reports for review
One site record, from walk to report.
360 capture on the floor plan, two-date comparison, BIM overlay and issue tracking.
One record, every Singapore requirement
JTC
Precast and PPVC tracking
Shop drawing to installation sign-off, a common IDD use case on GLS sites.
IDD and site record questions
What is Integrated Digital Delivery (IDD)?
IDD is BCA's framework for using digital technology to integrate work processes and connect the teams on a project. BCA lists 19 essential IDD use cases for reference, and Government Land Sales sites must show at least five in an implementation plan.
Is IDD mandatory in Singapore?
BCA requires Government Land Sales sites to show at least five IDD use cases in an implementation plan. Elsewhere, IDD is a choice made by the client or developer.
Which IDD use cases does Kodifly deliver?
Digital progress monitoring, inspection observations and follow-up, defect tracking, and BIM and 3D viewing, on one dated site record.
Can Kodifly keep the site supervision records?
Yes. The Building Control Regulations ask the Qualified Person to keep site records at the premises, including the site record book, attendance, inspection and approval before concreting, repairs to defective structural works and test records. SpatialSense keeps them digitally with dated photos and follow-up, searchable across the project.
What is CORENET X and does Kodifly support it?
CORENET X is Singapore's single submission route for regulatory approvals. From 1 October 2026, new projects of 5,000 m² or more submit through its Gateway Processes with IFC+SG BIM models. Kodifly checks the built site against the approved model after approval, with dated 360 and LiDAR records.
Does Kodifly track precast for IDD?
Yes. Kodifly tracks precast and PPVC elements from shop drawing to installation sign-off, which is live on a Singapore project and counts towards your IDD use cases.
Is there funding for Singapore firms?
BCA's Built Environment Technology and Capability (BETC) grant supports digital solutions, meaning IDD use cases and Built Environment Industry Digital Plan categories, for Singapore-registered firms from 1 April 2025 to 31 March 2030. For applications to 31 March 2027 it covers up to 70% of qualifying costs for SMEs and up to 50% for others, falling to 50% and 30% from 1 April 2027.
How do we apply for the grant?
Apply through the Business Grants Portal before signing a contract, paying anyone or starting the work. Third parties cannot apply on your behalf, and funding is assessed case by case. Kodifly can give you the product details your application needs.