Projects
Projects
Kodifly's engineers install and support site systems on Hong Kong government works, from SmartEye site hardware and software and fixed-point LiDAR to slope and earthwork volume monitoring. The work clients have cleared for publication is listed below by department. Site names are withheld at the clients' request.
- 5
- government departments and offices whose works use Kodifly
- 100+
- sites with Kodifly systems in place
- Gold
- CIC AI Award 2026 (DEVB's SmartEye, Kodifly as supporting partner)
Awards and collaborations.
Our work with the Development Bureau and MTR is on public record through awards and papers.

DEVB · 2026
SmartEye wins Gold at the CIC AI Award
DEVB's SmartEye platform won Gold in the quality inspection category. Kodifly is a supporting partner.

MTR · Slopes
AI slope safety monitoring
Developed by MTR with Kodifly. Silver medal at the 2025 International Exhibition of Inventions Geneva.

MTR · Light Rail
Roof-mounted LiDAR for trees along the line
A paper by MTR and Kodifly engineers won a 2025 Hong Kong Institution of Engineers award.
Public works by department.
Each card lists what we supplied to that department's works. Site names are withheld at the clients' request; ask us for references relevant to your contract.

5 published entries
Civil Engineering and Development Department
Site platform, slope gradient and earthwork volume monitoring, and drone survey for CEDD works.
What we supplied
- Slope gradient monitoring software
- SmartEye site hardware and software
- Volume monitoring software
- Drone survey
7 published entries
Drainage Services Department
SmartEye site hardware and software, site dashboards, and environmental and excavation-volume monitoring for several DSD works.
What we supplied
- SmartEye site hardware and software
- Site dashboard
- SmartEye site hardware
- Environmental monitoring and excavation-volume software
3 published entries
Architectural Services Department
SmartEye site hardware and software and site dashboards for several ArchSD works.
What we supplied
- SmartEye site hardware and software
- Site dashboard
1 published entry
Electrical and Mechanical Services Department
Fixed-point LiDAR watching an EMSD facility.
What we supplied
- Fixed-point LiDAR
1 published entry
Geotechnical Engineering Office
Monitoring of a flexible barrier for GEO.
What we supplied
- Flexible barrier monitoring
On site.
Our engineers install, set up and support the systems on Hong Kong sites.

Engineers and government staff inspect a scaffolded hillside on a Hong Kong works site. 
A Kodifly fixed-point LiDAR unit in front of public housing blocks and tower cranes under construction. 
A Kodifly equipment cabinet being installed on a tower crane at a housing site. 
A Kodifly LiDAR unit on a pole beside a flyover and a public housing estate. 
A LiDAR and camera unit on a pan-tilt head, facing a hillside works site. 
A site briefing with government and contractor staff beside site hoarding and scaffolding.
Want a reference close to your contract?
Tell us the contract type and what it asks for, and we will arrange relevant references and a demo.
