Skip to content
Kodifly
Get a sample AI report

Industries

Spatial AI for the assets governments run

Kodifly's AI, LiDAR and digital twins help public bodies and operators see, measure and monitor physical assets, from plants and tunnels to rail corridors, slopes, city infrastructure and public works. One dated record, whatever the asset.

Choose your industry

The same AI and the same dated record, applied to the assets you are responsible for.

  • A Kodifly LiDAR and camera unit on a pan-tilt head, facing a hillside works site

    Facilities

    Assets and facilities

    Fixed LiDAR and AI that watch plants, pumping stations and tunnels, and keep a dated record of every change.

  • A ScanStation LiDAR unit on a pole at dusk, with a green laser line scanning a gas processing plant, pipe racks and a flare stack in the desert

    Energy

    Oil and gas

    Always-on LiDAR and AI over plants, pipeline corridors and hot work, with intrusion and change alerts.

  • A drone capture of a road under construction

    Transport

    Rail and transport

    Monitoring of rail corridors, vegetation and nearby slopes, with alerts tied to dated measurements.

  • A Kodifly LiDAR unit and equipment cabinet on a pole above a protected hillside, with technicians at work

    Geotechnical

    Slopes and environment

    Slope gradient, flexible barrier, excavation volume and environmental monitoring, reported from one record.

  • A Kodifly LiDAR unit on a pole beside a flyover and a public housing estate

    Urban

    Urban management and public safety

    Computer vision and drone mapping for street-level assets, signage and public estates.

  • Ask AI in SpatialSense: the question "How many workers were on site on Saturday, and why did the Level 11 pour start late?", an answer with numbered source markers, workers by trade, the four source records and a timeline of the day

    Government AI

    Government AI

    Ask your own records a question and get an answer linked to its sources, with reports drafted for your team to review.

  • A Kodifly fixed-point LiDAR unit in front of public housing blocks and tower cranes under construction

    Works

    Construction and works supervision

    Digital supervision, site capture and safety records for public works, with each compliance requirement on its own page.

The capabilities behind every industry

Four building blocks, combined to fit each asset and each tender.

Public work we have delivered

Public works we have delivered for Hong Kong government departments, by scope.

DepartmentScope
ArchSDSmartEye site hardware and software
ArchSDSite dashboard
CEDDSlope gradient monitoring software
CEDDSmartEye site hardware and software
CEDDVolume monitoring software
CEDDDrone survey
DSDSmartEye site hardware and software
DSDSite dashboard
DSDSmartEye site hardware
DSDEnvironmental monitoring and excavation-volume software
EMSDFixed-point LiDAR
GEOFlexible barrier monitoring

Tell us the asset and what you need to prove

Describe the site, asset or tender. We will show how the same record applies to it.