Industries
AI that watches your oil and gas assets around the clock
Kodifly's fixed LiDAR, drones and AI give oil and gas operators a live, dated 3D record of plants, pipeline corridors and site works. It detects intrusion, change and unsafe work as they happen, with a local team in Saudi Arabia.

Built for oil and gas operations.
One platform watches the plant, the corridor and the works, and tells the right person when something changes.
10 capabilities, one record
Always-on LiDAR over plants and yards
Perimeter intrusion detection
Pipeline corridor and right-of-way watch
Hot-work and welding monitoring
Digital permit-to-work
Gas and confined-space alerts
PPE checks and worker counts
Tank and stockpile volumes
Dated evidence of turnaround works
AI-drafted daily reports
From a scan to a decision.
The same four steps on every asset, in any light.
Watch
Fixed LiDAR and cameras scan the plant and the corridor day and night. Drones cover what a fixed unit cannot see.
Detect
The AI lines up each scan with the last, finds change and spots people, vehicles and unsafe work.
Alert
The right supervisor gets an alert with the dated measurement attached, not a guess.
Report
Findings, permits and inspections land in one dated record, and the daily report drafts itself for your team to sign off.
Hardware and software
One partner from sensor to report.
Kodifly makes the LiDAR, writes the AI and installs both with its own engineers, so one team answers for the whole system.
- A Kodifly entity in Saudi Arabia, on Gulf time.
- Arabic interface and Arabic reports.
- Weatherproof ScanStation units, installed and supported by our engineers.
- Centimetre-level georeferenced point clouds.

Ask your facility a question.
Search inspections, permits and alerts in plain language. Every answer links to the records behind it.
- Which permits are open on the north unit?
- What changed in the yard since last Tuesday?
- Every answer is linked to its source.
The capabilities behind it.
See what our AI makes of your facility.
Tell us the site and what you need to watch. We will show you how it would work, with a sample AI report or a demo.
