Perspective
LAS vs LAZ: what's the difference, and which to send?
Published

LAS and LAZ hold exactly the same LiDAR point cloud. LAS is the open, uncompressed format that laser scanners and survey software export, while LAZ is that same file compressed without losing a single point, usually to somewhere between 7 and 20 percent of its original size. If you are sending a scan to someone, send the LAZ, and if they have nothing installed to open it, both open free in a browser tab with SpatialSense’s free point cloud viewer.
That answers most questions, but the details matter when a file won’t open, when a client asks why the download is 4 GB, or when someone mentions COPC and you aren’t sure whether it is a third format you need to support.
What is a LAS file?
LAS is the standard file format for exchanging LiDAR point clouds. It is maintained by the American Society for Photogrammetry and Remote Sensing (ASPRS), which publishes the specification openly. Version 1.4 dates from 2011, and LAS 1.5 was released in August 2025.
A LAS file is a header followed by a long list of points. Each point carries its X, Y and Z position, and usually more than that: the strength of the laser return, which return it was, a classification such as ground, building or vegetation, a GPS time and, in many files, a colour. Because every one of those values is stored in full, a site scanned at survey density quickly runs into gigabytes. That size is the whole reason LAZ exists.
What is a LAZ file?
LAZ is a LAS file compressed with LASzip, a free, open-source compressor from rapidlasso. The compression is lossless, so decompressing a LAZ gives you back the original LAS bit for bit, with no points thinned and no precision rounded off. rapidlasso puts typical LAZ files at 7 to 20 percent of the original size. The exact figure depends on the scan, but a file shrinking to around a tenth of its size is common.
The cost is a little processing time, because the software has to decompress the points as it reads them. On a modern laptop that is rarely noticeable, and it is far quicker than uploading or downloading the uncompressed file.
LAS vs LAZ at a glance
| Feature | LAS | LAZ |
|---|---|---|
| What it is | The ASPRS point cloud format, uncompressed | The same format, compressed with LASzip |
| File size | Full size | Typically 7 to 20 percent of the LAS |
| Points or precision lost | None: it is the uncompressed original | None: it decompresses to the identical LAS |
| Best for | Software that cannot read LAZ, or fast repeated reads during processing | Sending, sharing, archiving and storing scans |
| Open it free in a browser | Free LAS viewer by SpatialSense | Free LAZ viewer by SpatialSense |
Which should you send?
Send LAZ by default. It is smaller to email, upload and store, and most point cloud software, including free desktop tools, reads it directly, so the person receiving it rarely needs to do anything extra. Keep the LAS only when a specific piece of software in your workflow cannot read LAZ, or when a processing step reads the same file many times and you have the disk space to spare. Converting between the two is quick in either direction with LASzip or a tool built on it, so the choice is never permanent.
Where COPC fits
COPC, short for Cloud Optimized Point Cloud, is a newer name you may see in web viewers and data catalogues. It is not a third, competing format. A COPC file is a LAZ file, built to the LAS 1.4 rules, with its points arranged in an octree so that a program can fetch only the part of the scan it needs. Hosted on a web server that supports range requests, which most do, a COPC file lets a browser show the area you are looking at without downloading the whole thing first. Because it is still LAZ underneath, software that reads LAZ 1.4 can open a COPC file as a normal point cloud.
In practice, COPC matters if you publish large scans for other people to explore online. For a scan you are emailing to a colleague or a client, a plain LAZ does the job.
How to open a LAS or LAZ file free, without installing anything
The usual stumbling block is not the format but the software. A surveyor sends a LAZ, and the project manager or client who needs to look at it has nothing installed that can open it.
That is the problem our free SpatialSense point cloud viewer is built for. You open it from spatialsense.app, drop in a LAS, LAZ or PLY file, and it opens in the browser tab you already have, with no account to create. The file is not uploaded to a server. Measuring distances, areas and height profiles, clipping a section and leaving comments are all free, as the clip below shows on one of the viewer’s sample scans.
For notes on each format, see the free LAS viewer by SpatialSense and the free LAZ viewer by SpatialSense. If the scan arrived as an E57 instead, the free point cloud viewer will not open it; the SpatialSense E57 viewer page shows how to open it today in the full SpatialSense platform, free for 30 days.
Questions people ask
How do I open a LAS file?
Drop it into a free browser viewer, or import it into desktop point cloud software. With nothing installed, the quickest route is the free LAS viewer by SpatialSense: open it, drag the file in, and the scan appears in the tab with no account to create. Most desktop CAD, BIM and GIS programs can import LAS as well.
Can I open a LAZ file online for free?
Yes. SpatialSense’s free LAZ viewer opens LAZ, LAS and PLY files in the browser, with no account, and the file stays on your computer rather than being uploaded.
Is LAZ lossless?
Yes. LASzip compresses every point and attribute without loss, so a LAZ decompresses back to the identical LAS file.
Can CAD, BIM or GIS software open a LAZ file?
Often, but not always. Some desktop programs read LAZ directly, while others only import LAS or need the scan converted into their own point cloud format first. If a program refuses a LAZ, decompress it to LAS with LASzip, which loses nothing, or open it in the free point cloud viewer if you only need to look at it and measure it.
Do I need to convert a LAZ to LAS before I can open it?
Only if your software cannot read LAZ. Most point cloud tools, including SpatialSense’s free point cloud viewer, open LAZ directly, so in most cases there is nothing to convert.
How do I convert LAZ to LAS, or LAS to LAZ?
Use LASzip, the free compressor from rapidlasso, or any tool built on it. The conversion is lossless in both directions, so you can switch between the two as often as a workflow needs without degrading the scan. You don’t need to convert a LAZ just to view it: the free LAZ viewer reads it as it is.
How much smaller is a LAZ than a LAS?
Typically 7 to 20 percent of the LAS, according to rapidlasso, which makes LASzip. A 2 GB LAS usually becomes a LAZ of somewhere between about 140 and 400 MB, depending on the scan.
How do I send a large LAS or LAZ file to a client?
Send the LAZ rather than the LAS: it is the same data at a fraction of the size. If it is still too large to email, or the client has nothing to open it with, send a link instead. SpatialSense shares a point cloud as a browser link that the recipient opens with no account and nothing to install.
Can I measure a LAS or LAZ file without installing software?
Yes. SpatialSense’s free point cloud viewer measures distances, areas and height profiles straight off the scan in the browser, as the clip above shows. See how to measure a point cloud in the browser.
Can I open LAS or LAZ files on a Mac?
Yes. A browser viewer works the same on a Mac as on Windows, so there is no Mac version to hunt for. The point cloud viewer for Mac opens LAS, LAZ and PLY in your browser with nothing to install.
What is the difference between LAS and E57?
LAS is the standard exchange format for LiDAR point clouds: one long list of points, each with attributes such as classification, return number and GPS time. E57, specified by ASTM as E2807, is a vendor-neutral format for 3D imaging systems such as laser scanners. One E57 can hold several scans with their scanner positions, plus the images taken at each setup. Aerial and mobile LiDAR is usually delivered as LAS or LAZ, while tripod laser scans often arrive as E57.
How do I convert an E57 to LAS?
Most point cloud software can export an E57 to LAS. Expect to lose what LAS has no place for, such as the scanner images, and make sure the scans are registered to each other before you merge them into one file. If you only need to view, measure or share the scan, SpatialSense opens E57 in the browser, free for 30 days, so there is nothing to convert.
What is the difference between LAS and PLY?
PLY is a general 3D format that can store points or a mesh, with colour, and it is common from photogrammetry and handheld scanners. LAS is built for LiDAR and carries survey attributes that PLY does not, such as classification, return number and GPS time. Both open free in the browser: see the PLY viewer and the LAS viewer.
What is the difference between LAS 1.2 and LAS 1.4?
LAS 1.4, published by ASPRS in 2011, added point formats 6 to 10. These allow up to 15 returns per pulse and 256 classification classes, and the header can count far more points than LAS 1.2 allowed. Use 1.4 unless a program in your workflow only reads 1.2. LAS 1.5 followed in August 2025.
Where can I download a sample LAS or LAZ file?
Public elevation programmes publish real LiDAR for free. In the US, the USGS Lidar Explorer serves point cloud tiles from the 3D Elevation Program as LAZ. To try a viewer without downloading anything, the free point cloud viewer includes sample scans. To capture your own site, Kodifly runs fixed-point, drone and handheld LiDAR.
Which point cloud format should I deliver for as-built work?
Start with what the contract asks for. On Hong Kong public works, Kodifly delivers point clouds as .las, .rcs and .e57 on the Hong Kong 1980 Grid, alongside a mesh, ortho-images and video. See LOD-G as-built verification by point cloud for what recent contracts ask for.
Sources
- ASPRS LAS Specification, releases on GitHub (LAS 1.5 Revision 00, 26 August 2025)
- rapidlasso GmbH, LASzip: free and lossless LiDAR compression
- LASzip project
- Hobu, Inc., COPC 1.0 specification (Cloud Optimized Point Cloud)
- libE57, software tools for the E57 file format (ASTM E2807)
- USGS Lidar Explorer Map (3D Elevation Program point clouds)


