DEVB TC(W) No. 1/2025

LOD-G as-built verification by point cloud

LOD-G as-built verification checks that the geometry of a BIM model matches the built work, using a georeferenced point cloud. Recent Hong Kong public works contract specifications list as-built point cloud scanning among the model quality checks, next to LOD-G of geometry. Kodifly scans the site, reports each deviation against the model and delivers the files in open formats.

Last updated

BIM uses
3, 14, 15 and 19 in DEVB TC(W) No. 1/2025 Annex 1
Coordinates
Hong Kong 1980 Grid
Point cloud formats
.las, .rcs and .e57
Model exchange
IFC
Scanner accuracy (Singapore)
±2 mm over 10 m, at least 1 million points per second
Deviation target (Singapore)
No more than 10 mm

What LOD-G verification means

LOD-G is the Level of Development for graphics. It sets how much geometry each model element carries. LOD-I sets the information it carries. A model can pass every data check and still show a sleeve where none was built.

Recent Hong Kong public works contract specifications make the contractor's BIM quality plan cover model quality (LOD-G), data integrity (LOD-I) and as-built point cloud scanning or field survey for verification. The model compliance check covers grid, survey point, shared coordinates and LOD-G of geometry. A scan answers the geometry question with measurements.

DEVB TC(W) No. 1/2025 Annex 1 sets the BIM uses behind this work. Existing Conditions Modelling (use 3) and As-Built Modelling (use 15) are mandatory. 3D Control and Planning (use 14) requires digital setting-out and construction checking by 3D laser scanners, robotic total stations and similar on projects that require a DWSS, as far as practicable (note m). Asset Management (use 19) requires underground utilities surveys of all opened-up areas, so that a project UU BIM model can go to the maintenance agencies and the Lands Department (note n).

Hong Kong requirements and what Kodifly delivers

RequirementSourceKodifly
Existing conditions model from 3D digital survey, georeferenced to the Hong Kong 1980 GridTC(W) No. 1/2025 Annex 1, use 3Delivered: point cloud (.las, .rcs and .e57), build mesh (.tin), ortho-image (.jpeg, .png and .tiff) and H.264 video
Digital setting-out and construction checking by 3D laser scannerAnnex 1, use 14 and note mDelivered: set-out points from the model, then a scan check of the built work
As-built point cloud scanning to verify the modelAnnex 1, use 15; contract specificationsDelivered: deviation report per element against the model geometry
Underground utilities survey of all opened-up areasAnnex 1, use 19 and note nDelivered: scan of each opened area before backfilling, and the project UU BIM model
Tolerances set in millimetresContract specificationsMeets: survey-grade terrestrial scanning, ±2 mm over 10 m
All tools and software IFC compliantContract specificationsMeets: models open from IFC and results return in IFC workflows
CIC BIM Standards, DEVB BIM Harmonisation Guidelines, ArchSD BIM Guides, EMSD BIM-AM, Lands Department Building CSU guidelineContract specifications; TC(W) No. 1/2025 paragraph 19Meets: deliverables follow the standards the contract names

Singapore: LiDAR-based design validation

JTC's Robotic and Automation specification for LiDAR-based design validation asks the contractor to verify any deviation of constructed works against design before backfilling, patching, closing of formwork or boxing-up. The scans cover all M&E underground services, M&E embedded services, and RC wall and beam penetrations. Reports go in progressively, before each area is covered.

What the JTC specification asks for, all delivered

  1. Terrestrial LiDAR scanner

    • Accuracy of ±2 mm over a 10 m range
    • At least 1 million points per second
    • Field of view of at least 300° horizontal and ±90° vertical
    • Integrated inertial measurement unit, with GPS as an option for outdoor slabs
  2. Deviation report before cover-up

    • Dimensional variance analysis between the scan and the BIM model geometry
    • Each deviation identified and measured, against a target of no more than 10 mm
    • Quality compliance assessment that highlights areas needing corrective action
    • Annotated point-cloud overlays showing where each deviation sits
    • Recommended corrective measures for deviations beyond tolerance

How a verification runs

  1. Set control

    Tie the scan to the project grid, the Hong Kong 1980 Grid in Hong Kong, so scan and model share coordinates.

  2. Scan before cover

    Scan each zone before backfilling, patching, closing formwork or boxing up.

  3. Compare

    Lay the point cloud over the model geometry and measure the deviation of each element.

  4. Report and hand over

    Issue the report with overlays and corrective measures, and hand over the files.

LOD-G verification, answered

What is LOD-G?

LOD-G is the Level of Development for graphics, the amount of geometry a BIM element carries. LOD-I covers its information. Hong Kong contract specifications check both, and add as-built point cloud scanning or field survey to verify the model.

Which DEVB BIM uses does a scan cover?

Four uses in DEVB TC(W) No. 1/2025 Annex 1. Existing Conditions Modelling (use 3), 3D Control and Planning (use 14, note m), As-Built Modelling (use 15) and Asset Management (use 19, note n), which includes the underground utilities survey.

Is a deviation report the same as design coordination?

No. A deviation is a measured difference between the built work and the model. It is checked on site, after the work is built and before it is covered. Coordination between design models is your BIM consultant's work.

What does JTC require for LiDAR design validation?

A terrestrial scanner with ±2 mm accuracy over 10 m, at least 1 million points per second and a field of view of at least 300° by ±90°. Deviation reports compare the point cloud with the BIM model before cover-up, with a target of no more than 10 mm, annotated overlays and corrective measures.

Who authors the as-built model?

Your BIM team or consultant authors it in your BIM software. Kodifly supplies the survey, the scan checks and the deviation reports that show the model matches the site, and the project UU BIM model from the utilities survey.

Check your model against the site

Send us the model and the zones to be covered next. We will show a deviation report on your own work.