Skip to content
Kodifly
Get a sample AI report

News

SmartEye wins the CIC AI Award 2026 Gold Award

Published

The Kodifly team and the Development Bureau team holding the CIC AI Award 2026 certificate and trophy at the SmartEye booth
The Kodifly team and the Development Bureau team with the CIC AI Award 2026 certificate and trophy at the SmartEye booth.

SmartEye, the Co-supervision Platform developed by Hong Kong’s Development Bureau (DEVB), won the Gold Award in the AI Research and Development (Quality Inspection) category of the CIC AI Award 2026. The award was presented at the CIC Global AI and Smart Construction Conference and Exhibition (GASCCE 2026), held at Hong Kong Science Park on 24 and 25 June 2026.

The award belongs to DEVB. Kodifly is a supporting partner of SmartEye.

The first CIC AI Award

According to the Construction Industry Council (CIC), the award was established in its “Year of AI” to recognise how industry stakeholders, technology providers and academic institutions apply artificial intelligence in the built environment. It received 258 project submissions across 12 award categories. The CIC presented 18 AI Adoption awards and 32 AI Research and Development awards.

SmartEye appears in the Quality Inspection category of the AI Research and Development awards, where the CIC’s awardee list names it as the Gold Award winner.

What SmartEye is

Under DEVB Technical Circular (Works) No. 1/2026, the Co-supervision Platform is DEVB’s remote supervision system for capital works above HK$400 million that are tendered from 1 April 2026. The scope and rules are set out in Co-supervision Platform: scope and vetting.

Kodifly’s part

Kodifly supplies the fixed-point and fixed-route 4D LiDAR, cameras and edge units that SmartEye runs on, on about 20 Hong Kong public works contracts. The hardware is described on the Co-supervision Platform page. The platform itself is developed in-house by DEVB, and the award recognises DEVB’s work.

The photograph above shows the Kodifly team with the DEVB team and the award at the SmartEye booth.

To see how dated site capture works on a contract, talk to us.

Sources

  • DeploymentsKodifly has fitted around 20 Hong Kong public works contracts with LiDAR, cameras and edge units for the Co-supervision Platform. Departments, scope and how we deploy.
  • Fixed-point vs fixed-routeTC(W) No. 1/2026 allows fixed-point LiDAR on poles or tower cranes and fixed-route LiDAR on drones or robots. When to use each, blind spots, and how Kodifly plans both.
  • FunctionsThe nine Co-supervision Platform functions and four SmartEye technologies in TC(W) No. 1/2026 Annex A, the site data each needs, and how Kodifly supplies it.
  • Particular SpecificationWhat the CSP Particular Specification under DEVB TC(W) No. 1/2026 requires, clause by clause, from LiDAR and edge hardware to accuracy, testing and security.
  • Scope and vettingTC(W) No. 1/2026 requires the Co-supervision Platform for capital works above HK$400 million tendered from 1 April 2026. Scope, vetting, exemptions and the DWSS link.
  • SmartEye compatible captureWhat capture data SmartEye, DEVB's Co-supervision Platform, needs under TC(W) No. 1/2026, and how Kodifly's LiDAR, cameras, sensors and edge units deliver it.

Talk to us about your corridor or slope

Tell us the asset, the risk and who needs the alerts. We will show how a dated record would work for it.