DEVB TC(W) No. 3/2023, Annex A 5(12)(c)
Digitised permit-to-work system for high-risk activities
Clause 5(12)(c) of DEVB TC(W) No. 3/2023, Annex A, requires a digitised permit-to-work system for online, real-time application, issue and tracking of permits for high-risk activities such as confined space, hot work and lifting. Supervisors see live permit status on a phone, and an expired permit raises an alert. Kodifly runs it on SpatialSense.
Last updated
What the circular requires, and how sites use it
The circular asks for a digitised system that handles application, issue and tracking of a permit-to-work, or a permit to move and operate, online and in real time (clause 5(12)(c)(i) and (ii)). It adds to whatever the contract already requires. The Buildings Department and CIC list it as a digitised permit-to-work system for high-risk activities.
On a Hong Kong site, a foreman raises the permit on a phone, the right person issues it, and supervisors and site management see its status live. Nobody chases paper. When a permit lapses, the supervisor and the Safety Officer are told at once rather than at the next walk-round.
High-risk activities named in clause 5(12)(c)(i)
The list is a sample. The contract drafter adjusts it, and the contractor or the Project Manager can add further activities.
Activities covered
- Work in confined spaces.
- Work with electrical hazard.
- Work in a lift shaft.
- Mobile crane, heavy machinery and piling rig operating or moving on the site.
- Hot work.
- Use of a MEWP.
- Lifting operations by tower cranes, mobile cranes, crawler cranes or similar, or by mechanical means. A load of 2.5 tonnes or less within 2.5 m of the edge of the crane is excluded.
- Other high-risk activities proposed by the contractor or specified by the Project Manager, Engineer or Supervising Officer.
Added in some contract specifications
- Use of a ladder for work above ground. Some contract specifications list it in place of MEWP use, so the seven permit types become confined space, electrical, lift shaft, heavy plant and piling, hot work, ladder work and lifting.
What the system must do
| Function | Clause | Requirement |
|---|---|---|
| Electronic permits | (c)(ii) | Application, issue and tracking of the permit to work, or permit to move and operate, on the site. |
| Live status | (c)(ii) | Site supervisors and site management open the system on a mobile device and see the real-time status of each permit. |
| Expiry alert | (c)(iii) | The mobile device shows an alert if a permit has expired. |
| Automatic message | (c)(iii) | SMS or in-app pop-up to site supervisors and the Safety Officer. |
| Record | (c)(iii) | Recorded at the platform for follow-up, with the permit details and the date and time of the alert. |
What some contract specifications add
Compliance matrices for recent Hong Kong public works score these beside clause 5(12)(c). SpatialSense meets each.
| Topic | Requirement |
|---|---|
| Web and mobile | A full web version in desktop browsers, and an iOS and Android app for field inspection, review and electronic signatures. |
| Offline | Permits viewed and signed offline, with data cached in disconnected work areas such as shafts and tunnels, then synced. |
| Approval tiers | Distinct roles for applicant, assessor, competent person, Safety Officer and Project Manager. |
| Access and audit | Role management, permission assignment and an immutable audit log. |
| Confined space permit | Atmospheric testing logs and emergency rescue provisions. |
| Electrical permit | High-voltage isolation and lock-out, tag-out checks. |
| Lift shaft permit | Lift shafts, deep vertical shafts and floor openings of 500 mm x 500 mm or larger. |
| Hot work permit | Flame cutting and welding, with fire watch sign-off. |
| Height and ladder permit | Working at height, portable ladders and safety harness tie-off checks. |
| Links | Interfaces to smart locks, gas sensors and other IoT devices. |
| Configuration | Permit forms, approval workflows, checklists and report formats set to the contract. |
From request to expiry
Request
The permit holder applies online for the activity, place and time.
Issue
The authorised person approves and issues it. The permit shows as live.
Watch
Supervisors see every live permit on a phone, by activity and area.
Expire
At expiry the device alerts and a message goes to supervisors and the Safety Officer.
Close
The permit is closed or renewed, and the record stays on the platform.
How Kodifly supplies, installs and runs it
Permit-to-work is a module of SpatialSense, so permits, alerts and the DWSS safety records sit in one place.
Software, set-up and support together
Online application, issue and tracking
Live status on supervisors' phones
Expiry alerts by SMS or in-app pop-up
Permit types set for the listed activities, including ladders and MEWPs
iOS and Android app with offline signing
Approval tiers and an immutable audit log
Alert record on the platform
Same system as DWSS
Training for permit holders and issuers
Signed offline, synced with an audit log.
A ladder permit is signed on a phone without signal. It syncs when the phone reconnects, and every step stays in the audit log.
Digital permit-to-work, answered
What does the circular require of a digital permit-to-work system?
Online, real-time application, issue and tracking of permits for high-risk activities, live status on a mobile device, and an automatic alert when a permit expires (Annex A, clause 5(12)(c)).
Which activities does it cover?
The sample lists confined space, electrical hazard, lift shaft, mobile crane and heavy machinery, hot work, MEWP use and lifting operations, plus other activities the contractor or the Project Manager adds (clause 5(12)(c)(i)). Some contract specifications list use of a ladder for work above ground instead of MEWP use.
Do permits cover ladder work?
Where the contract lists it, yes. Some contract specifications add use of a ladder for work above ground to the permit list and ladders to the tracking system. SpatialSense carries a ladder and work-at-height permit with harness tie-off checks.
What counts as a permit to move and operate?
The clause covers a permit-to-work or a permit to move and operate, for example for mobile cranes, heavy machinery and piling rigs operating or moving on the site (clause 5(12)(c)(i)).
Who is alerted when a permit expires?
Site supervisors and the Safety Officer, by SMS or in-app pop-up. The alert is recorded at the platform with the permit details and the date and time (clause 5(12)(c)(iii)).
Is the permit-to-work part of the DWSS?
Yes, where the contract adopts both. The 4S platform shall be amalgamated into the DWSS (TC(W) No. 8/2025, paragraph 7, footnote 1), so the permit records sit in the same hub as the site safety inspection records.
Does every lifting operation need a permit?
Not every one. The sample excludes lifting a load of 2.5 tonnes or less within 2.5 m of the edge of the crane. Other lifting by tower, mobile or crawler cranes, or by mechanical means, is covered (clause 5(12)(c)(i)).
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
- Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
- Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.
Take your permits online
Tell us the activities and the permit types on your contract. We will set up the permit flow and alerts.
