DEVB TC(W) No. 3/2023, Annex A 5(12)(f)
Smart monitoring devices for workers and frontline site personnel
Clause 5(12)(f) of DEVB TC(W) No. 3/2023, Annex A, requires smart wearables, such as a smart wristband or smart helmet, for every worker and frontline site person. They track location indoors and outdoors, alert on standstill and on body temperature or heart rate over a threshold, and warn on entry to restricted areas. Kodifly supplies and runs them.
Last updated
What the circular requires, and how sites use it
The contractor provides every worker and frontline site person deployed for the works with a smart monitoring device or an equivalent wearable, including but not limited to a smart wristband or smart helmet (clause 5(12)(f)(i)). The Buildings Department and CIC name the category smart monitoring devices for workers and frontline site personnel.
On a Hong Kong site, the wearable tells the platform where people are, indoors and outdoors, and flags a person who has stopped moving or whose readings cross a threshold. It also warns a worker who walks into an area they are not authorised to enter.
The circular limits what the platform shows. Actual vital sign data is not displayed, to protect privacy. Data collection must comply with the Personal Data (Privacy) Ordinance (clause 1(2)), and frontline staff are briefed on it at site induction (clause 1(4)).
Functions in Annex A, clause 5(12)(f)(ii)
The list reads include, but not limited to.
| Function | What it says |
|---|---|
| Location | Indoor and outdoor tracking, shown on the platform, with a record of people by area and time. Location data is stored on the platform. |
| Standstill | Real-time detection of standstill with an alert. SMS or in-app pop-up, recorded for follow-up. The standstill period is adjustable. |
| Body temperature and heart rate | Real-time detection with an alert when a threshold is exceeded. SMS or in-app pop-up, recorded for follow-up. Thresholds are adjustable. |
| Privacy | Actual vital sign data is not displayed on the platform. |
| Power | Battery and wireless charging. |
| Connectivity | Cellular, Wi-Fi, NB-IoT and/or LoRa, or equivalent. |
| Restricted areas | Only authorised workers may enter. Unauthorised entry triggers alerts to the workers and frontline personnel. |
What some contract specifications add
Compliance matrices for recent Hong Kong public works score these wearable duties beside clause 5(12)(f). Kodifly's wearables meet each.
| Topic | Requirement |
|---|---|
| Battery | At least 48 hours, two full days, of continuous normal site use. |
| Man-down | Fall and man-down detection with an alert to the platform. |
| SOS | A panic SOS button on the device. |
| Evacuation broadcast | Emergency evacuation warnings and safety alerts sent from the platform to every wearable. |
| Positioning | Real-time location (RTLS), with the wireless link stated for alerts, health readings and location. |
| Pairing | Quick pairing of each device to the worker's profile, trade and emergency contact. |
From wearable to supervisor
Wear
Each worker is issued a wearable at induction and told what it records.
Locate
The platform shows where people are, indoors and outdoors.
Detect
Standstill, or temperature or heart rate over the set threshold, raises an alert.
Notify
An SMS or in-app pop-up goes out and the event is recorded.
Respond
A supervisor checks on the person. The vital sign values themselves stay hidden.
How Kodifly supplies, installs and runs it
Wearables, platform and set-up are one package, joined to the same hub as the other 4S devices.
Devices, software and set-up together
Wearables in the form the clause names
Indoor and outdoor location on the platform
Adjustable standstill and vital sign thresholds
Restricted area warnings
48-hour battery, man-down and SOS
Evacuation broadcast to every wearable
Alerts by SMS or in-app pop-up
Vital sign values kept off the dashboard
Issue, charging and induction arrangements
Worker monitoring, answered
What does the circular require for worker monitoring?
Smart wearables for every worker and frontline site person, with location tracking, standstill and vital sign alerts, and restricted area warnings (Annex A, clause 5(12)(f)).
What wearables count?
A smart monitoring device or an equivalent wearable, including but not limited to a smart wristband or a smart helmet (clause 5(12)(f)(i)).
Can the platform show a worker's heart rate?
No. Actual body vital sign data must not be displayed on the platform for privacy protection. The platform shows alerts when thresholds are exceeded (clause 5(12)(f)(ii)).
Can the thresholds be changed?
Yes. The standstill period and the body temperature and heart rate thresholds are adjustable (clause 5(12)(f)(ii)).
How does the data protection law apply?
The operation and collection of data from all 4S components must comply with the Personal Data (Privacy) Ordinance, Cap. 486, and frontline personnel are briefed on data collection during site induction (clauses 1(2), 1(4) and 3(3)).
How long does the battery last?
At least 48 hours of continuous normal site use, the figure recent compliance matrices set. The devices also charge by battery and wirelessly, as clause 5(12)(f)(ii) asks.
Can the platform warn every worker at once?
Yes. SpatialSense broadcasts evacuation warnings and safety alerts to every wearable, and each wearable has an SOS button and man-down detection.
How do wearables help in confined spaces?
The confined space clause allows worker counting and location tracking to rely on the worker monitoring devices where they cover the function adequately (clause 5(12)(h), note).
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
- Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
- Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
Equip your workforce
Tell us the trades and headcount. We will plan the wearables and the thresholds.
