Skip to content
Kodifly
Book a demo

DEVB TC(W) No. 3/2023, Annex A 5(12)(a)

Centralised management platform (CMP) for the Smart Site Safety System

The centralised management platform (CMP) is the one-stop hub of a Smart Site Safety System. It receives, records and displays alerts from every device (DEVB TC(W) No. 3/2023, paragraph 5 and Annex A, clause 5(12)(a)). It runs automatically, allows at least 30 users and keeps data for at least 3 months. Kodifly runs it on SpatialSense, joined to the DWSS.

Last updated

What the circular requires of the platform

Paragraph 5(c) calls the CMP a one-stop hub for data analysis and alerts, and for follow-up on hazards and abnormalities. Annex A, clause 5(12)(a)(i), asks the contractor to provide and operate it, to respond to, manage and record signals from all 4S components, and to run it in automatic mode. It must work with the contract BIM model. Where a contract adopts both, the CMP shall be amalgamated into the DWSS (TC(W) No. 8/2025, paragraph 7, footnote 1).

On a Hong Kong site, the CMP is a live screen in the site office and the same view on supervisors' phones. A trained member of site management watches it during working hours and attends to alerts at once. The contractor draws the monthly 4S report for the Site Safety Management Committee from its records (clause 5(11)).

Platform requirements in Annex A, clause 5(12)(a)

TopicClauseWhat it says
Operation(i)Automatic mode. Compatible with the BIM model. A trained site management person oversees it and attends to alerts promptly.
Continuity(ii)Backup equipment, power, data storage, telecommunication, repair personnel and emergency support.
Display(iii)Video, audio, image and data on one platform. Highlighted pop-up warnings with follow-up actions. At least 30 concurrent users.
Streaming(iv)Real-time distributed event data streaming, and real-time video from the AI safety monitoring system.
Dashboard and training(v)A dashboard with a unique web link, and training for designated management staff.
Access policy(vi)User accounts, support staff access and account management, accepted before delivery.
Storage(vii)Automatic filing of all data, video, audio and images for at least 3 months, hosted at the site office, a data centre or the cloud.
Access(viii)Web browser over HTTPS. No other software or licences.
Hosting(ix) and (x)Firewall or VPN for site-hosted servers. For data centre or cloud hosting, a TIA-942 certified Tier 3 data centre and ISO/IEC 27001, with an up-to-date independent auditor report such as ISO/IEC 20000 or ISO/IEC 27017.
Security(xi) and (xii)At least 256-bit SSL for all traffic. IT security audits to the Security Regulations and the OGCIO Baseline IT Security Policy.

What each device sends to the platform

Each alert is recorded for follow-up, with the details Annex A names.

DeviceClause 5(12)Recorded at the platform
Plant and tool tracking(b)Equipment ID, date and time of scan, status and record.
Permit-to-work(c)Permit details, and date and time of the expiry alert.
Electronic lock(d)Lock location, date and time, electronic key number.
Mobile plant and tower crane alerts(e)Date and time of encroachment, with a video clip from 15 seconds before to 10 seconds after.
AI safety monitoring(g)Alert, response time and video from 1 minute before to 1 minute after.
Confined space monitoring(h)Warnings and response times.
MEWP, putlog and fire detection(i) to (k)Device status or sensor ID, location, date and time, with video for fire.

What some contract specifications add

Compliance matrices for recent Hong Kong public works score these platform duties. SpatialSense meets each.

TopicRequirement
RedundancyA redundancy plan, with a report, for 99.99% availability.
HostingTier 3 cloud hosting of the web dashboard, with 3D BIM, GIS mapping and an automatic alert engine.
APITwo-way REST API to query, extract and ingest raw and processed data, documented in OpenAPI v3.
Sign-on and data hubSingle sign-on with the main contractor's directory, and an SFTP data hub with a CRC check.
DWSS and SDMPlatform data joined to the DWSS and its Smart Document Management.
DashboardLayout and widgets the contractor can change without the supplier.
StaffingA qualified systems administrator at the site office during working hours.

How Kodifly supplies, installs and runs it

The platform is SpatialSense, so the CMP and the DWSS are one system.

Platform, set-up and operation together

  • SpatialSense as the CMP

  • Joined to the DWSS hub

  • Dashboard with a unique web link

  • Access policy drafted for acceptance

  • Training for designated management staff

  • Tier 3 hosting with ISO/IEC 27001

  • Monthly 4S report from the record

  • Back-up monitoring plan

Centralised management platform, answered

What is the centralised management platform in a 4S?

A one-stop hub for data analysis and alerts, and for follow-up on hazards and abnormalities (paragraph 5(c)). In Annex A it responds to, manages and records signals from every 4S component on the site (clause 5(12)(a)(i)).

Can the CMP be part of the DWSS?

Yes. The circular says it may amalgamate with the DWSS (paragraph 5, footnote 1), and TC(W) No. 8/2025 says it shall where both are adopted (paragraph 7, footnote 1).

How many users must the platform support?

At least 30 concurrent users (clause 5(12)(a)(iii)).

How long must the data be kept, and where?

At least 3 months. Servers may be at the site office or in a data centre or cloud system (clause 5(12)(a)(vii)).

What security does the CMP need?

Firewall or VPN separation for site-hosted servers, at least 256-bit SSL for all network traffic, and IT security audits to the OGCIO Baseline IT Security Policy. Data centre or cloud hosting must meet a standard such as a TIA-942 certified Tier 3 data centre and ISO/IEC 27001, with an up-to-date independent auditor report such as ISO/IEC 20000 or ISO/IEC 27017 (clauses (ix) to (xii)). SpatialSense meets each.

Who must watch the platform?

A trained site management person from the contractor, during working hours, who attends to alerts and emergencies promptly (clause 5(12)(a)(i)).

What if a device fails?

The implementation plan must include an alternative monitoring back-up plan for each component (clause 2(1)(d)), and repair or replacement is due within 24 hours of a fault report (clause 5(5)).

More Smart Site Safety guides

  • 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
  • AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
  • 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
  • Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
  • Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
  • API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
  • 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
  • Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
  • Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
  • Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
  • Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
  • Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
  • VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
  • Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.

See the platform against your clauses

Send us the Particular Specification. We will walk through SpatialSense clause by clause.