DEVB TC(W) No. 3/2023, Annex A 5(12)(h)
Confined space monitoring system for the Smart Site Safety System
Clause 5(12)(h) of DEVB TC(W) No. 3/2023, Annex A, requires a confined space monitoring system for locations defined under the Confined Spaces Regulation (Cap. 59AE). It counts and tracks workers, checks PPE and breathing apparatus, and reads oxygen, toxic and combustible gas levels with real-time alerts. Kodifly supplies, installs and runs it.
Last updated
What the circular requires, and how sites use it
The contractor proposes and implements a Confined Space Monitoring System for the site locations defined as confined spaces under the Factories and Industrial Undertakings (Confined Spaces) Regulation, Cap. 59AE (clause 5(12)(h)(i)). The Buildings Department and CIC name it the confined space monitoring system.
In a confined space the danger is out of sight. The system counts who is inside, checks that each person has the right PPE, breathing apparatus and qualifications before entry, and watches the air. If a reading crosses its set level, or a worker's condition looks wrong, it alerts at once.
CIC's 4S Labelling Scheme guide adds that an environmental monitoring system for harmful gas detection, and a network inside the confined space, are recommended too.
Functions in Annex A, clause 5(12)(h)
| Function | What it says |
|---|---|
| Worker count and location | Real-time counting and location tracking of workers inside confined spaces. |
| Entry checks | Check that workers wear and carry the necessary PPE and breathing apparatus and hold the necessary qualifications before entry. |
| Air readings | Oxygen, temperature and PM2.5, plus carbon monoxide, carbon dioxide, hydrogen sulphide, methane and combustible gas. |
| Alerts | A real-time alert if any parameter passes its pre-determined safety level, or any anomaly in a worker's condition is detected. |
| Management | All sensors and alerts managed by the centralised management platform, or by a control platform where the contract has no CMP. |
| Records | Warnings and response times transferred automatically to the platform for viewing, encrypted, in a display format the Project Manager accepts. |
What some contract specifications add
Compliance matrices for recent Hong Kong public works, including tunnel contracts, score these beside clause 5(12)(h). Kodifly meets each.
| Topic | Requirement |
|---|---|
| Calibration | Traceable gas sensor recalibration and replacement bump-test kits for the whole contract, with calibration certificates. |
| Underground link | A stated wireless link, such as LoRa, ultra-wideband or leaky feeder, that carries data from shafts and tunnels to the surface. |
| Evacuation beacons | Visual and audible beacons at the space, with motion detection on the gas unit. |
| Entry checks | Some contract specifications leave out the PPE and qualification check. Kodifly keeps it where the contract lists it. |
How it works with permits and locks
Permit
Work in a confined space needs a digital permit-to-work (clause 5(12)(c)).
Open
The entrance is an electronic lock that opens to authorised keys (clause 5(12)(d)).
Check
Workers are counted and checked for PPE, breathing apparatus and qualifications.
Monitor
Sensors read the air and wearables track the people inside.
Alert
A reading or worker anomaly raises an alert, and the response time is recorded.
How Kodifly supplies, installs and runs it
Sensors, tracking and the platform link are one project, and sit beside the permit and the lock.
Devices, software and installation together
Oxygen, gas, temperature and PM2.5 sensors
Worker counting and location inside the space
Entry checks for PPE and qualifications
Real-time alerts on set safety levels
Response time record on the platform
Permit-to-work and lock on the same platform
Installation at each confined space
Recalibration and bump testing
LoRa, ultra-wideband or leaky feeder link from underground
Confined space monitoring, answered
What does the circular require for confined spaces?
A system that counts and tracks workers, checks PPE and breathing apparatus, monitors the air and alerts in real time, for locations defined as confined spaces under Cap. 59AE (Annex A, clause 5(12)(h)).
Which gases and readings must be monitored?
Oxygen, temperature, PM2.5, carbon monoxide, carbon dioxide, hydrogen sulphide, methane and combustible gas (clause 5(12)(h)(i)).
When does it alert?
When any monitored parameter exceeds the pre-determined safety level, or any anomaly of a worker's condition is detected (clause 5(12)(h)(i)).
Can wearables and AI cameras cover worker counting and PPE checks?
Yes. The note says the two bullets on worker counting and PPE checks are amended if worker monitoring devices and AI safety monitoring are specified and adequately cover the function (clause 5(12)(h)(i), note).
Where are the alerts managed?
At the centralised management platform, or at a control platform where the contract has no CMP. Warnings and response times go there automatically and are encrypted (clause 5(12)(h)(ii) and (iii)).
How does the data get out of a tunnel or shaft?
Over a wireless link planned for the space, such as LoRa, ultra-wideband or a leaky feeder. Kodifly lays out the link with the gas units so readings and alerts reach the platform from underground.
Who calibrates the gas sensors?
Kodifly. Recent compliance matrices ask for traceable recalibration and bump-testing kits for the whole contract, and Kodifly provides both with calibration certificates.
Is a permit also needed to enter?
Yes. The sample digital permit-to-work lists work in confined spaces among its high-risk activities, and the sample electronic lock list includes confined space entrances (clauses 5(12)(c)(i) and 5(12)(d)(i)).
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
- Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
- Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
- Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.