DEVB TC(W) No. 3/2023, Annex A 5(12)(d)
Smart locks for hazardous areas: electronic lock and key access control
Clause 5(12)(d) of DEVB TC(W) No. 3/2023, Annex A, requires electronic locks that open only to authorised electronic keys on hazardous areas such as electrical cabinets, floor openings, confined spaces and lift shafts. A forced or outdated-key opening sounds a siren of at least 70 dB and alerts supervisors. Kodifly supplies, installs and runs the locks and keys.
Last updated
What the circular requires, and how sites use it
The circular asks for an automated access control and warning system that stops unauthorised opening of locked covers, doorways and barriers to hazardous areas (clause 5(12)(d)(i)). The key point is the identity in the key. An electronic lock opens only to an authorised electronic key that carries its owner's identity (clause 5(12)(d)(ii)). The Buildings Department and CIC name it hazardous areas access control by electronic lock and key system.
On a Hong Kong site, that means a lock on the electrical distribution board, on the lift shaft opening and on the confined space entrance, each opened by a named person. The contractor keeps a register of keys and their authority, and reviews it periodically.
Hazardous areas named in clause 5(12)(d)(i)
The clause says the list is not limited to these. The contract drafter adjusts it to the contract.
Areas to lock
- Electrical distribution board cabinets.
- Floor openings of 500 mm x 500 mm or larger.
- Entrances to confined space areas.
- Lift shaft openings.
Requirements in Annex A, clause 5(12)(d)
| Topic | Clause | What it says |
|---|---|---|
| Authorised keys | (d)(ii) | The lock opens only to authorised electronic keys with the key owner's identity embedded. |
| Authority review | (d)(ii) | The contractor reviews and renews lock access authority periodically or as necessary. |
| Key register | (d)(ii) | An updated register of every electronic key issued and the locks it may open. No unauthorised duplication. |
| Siren and light | (d)(iii) | A forced opening or an outdated key triggers a siren of at least 70 dB, or a higher level as agreed, and/or a flashing red light. |
| Silencing | (d)(iii) | The siren stops only when the lock is re-engaged or an authorised key is used. |
| Alert message | (d)(iii) | SMS or in-app pop-up to site supervisors, the Safety Officer and the Registered Electrical Worker. |
| Record | (d)(iii) | Recorded at the platform with the lock location, date and time, and electronic key number. |
What some contract specifications add
Compliance matrices for recent Hong Kong public works score these lock duties beside clause 5(12)(d). Kodifly's locks meet each.
| Topic | Requirement |
|---|---|
| Battery | At least 6 months of continuous site operation, with a battery life calculation and test report. |
| Fail-secure | The lock stays locked on power loss, low battery or reboot. |
| Offline whitelist | Authorised keys stored in the lock memory, so named operatives can open it during a network outage. |
| Low battery | A warning to the platform dashboard when charge drops below 20%. |
| Tamper alarm | A local siren of at least 70 dB with a strobe, and an instant alert to the platform, when the lock is forced or broken. Some contract specifications ask for siren and light together, not either. |
| Event log | Every lock and unlock event logged with the operative's identity, trade, date and time. |
| Connectivity | The wireless mode stated for each lock, such as Bluetooth Low Energy, 4G, LoRa or NB-IoT. |
| Override | A mechanical key cylinder for a depleted battery or a failed connection. |
When a lock is forced
Attempt
Someone tries an outdated key, or forces the lock.
Warn
The siren sounds at the lock and the red light flashes.
Alert
Supervisors, the Safety Officer and the Registered Electrical Worker get an SMS or pop-up.
Record
The platform logs the lock location, date, time and key number.
Reset
The siren stops when the lock is re-engaged or an authorised key is used.
How Kodifly supplies, installs and runs it
Locks, keys, alerts and the key register are one package, joined to the same platform as the other 4S devices.
Devices, software and installation together
Electronic locks for cabinets, openings and shafts
Electronic keys with the owner's identity
Key register and authority review
Siren and flashing red light at the lock
6-month battery, fail-secure and offline whitelist
Alerts to supervisors, Safety Officer and electrical worker
Lock event record on the platform
Fitting at each hazardous area
Smart locks for hazardous areas, answered
What does the circular require of hazardous area access control?
Electronic locks on hazardous areas that open only to authorised electronic keys, with a siren and alerts when someone tries to open one with an outdated key or by force (Annex A, clause 5(12)(d)).
Which areas must be locked?
The sample lists electrical distribution board cabinets, floor openings of 500 mm x 500 mm or larger, entrances to confined space areas and lift shaft openings (clause 5(12)(d)(i)). The drafter adjusts the list.
How loud must the siren be?
At least 70 dB, or a higher level agreed with the Project Manager or equivalent, and/or a flashing red light. It can be switched off only when the lock is re-engaged or an authorised key is used (clause 5(12)(d)(iii)).
Who is alerted when a lock is tampered with?
Site supervisors, the Safety Officer and the Registered Electrical Worker, by SMS or in-app pop-up, with the lock location, date and time, and electronic key number (clause 5(12)(d)(iii)).
What must the contractor keep for the keys?
An updated register of every electronic key issued, with the authority to open each lock. The contractor reviews and renews access authority periodically and prohibits unauthorised duplication (clause 5(12)(d)(ii)).
What happens if the battery runs low or the network drops?
Kodifly's locks run at least 6 months on a battery, warn the platform below 20% charge, stay locked on power loss and keep an offline whitelist so authorised keys still work during an outage. These are the duties recent compliance matrices score.
Where are the lock alerts recorded?
At the centralised management platform, or a control platform where the contract has no CMP, for the contractor's follow-up action (clause 5(12)(d)(iii)).
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
- Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
- Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.
Lock down your hazardous areas
Send us the layout and the areas to protect. We will plan the locks, keys and alerts.