Skip to content
Kodifly
Book a demo

DEVB TC(W) No. 3/2023, Annex A 5(12)(b)

Digitised tracking of site plant, lifting gear and powered tools

Annex A, clause 5(12)(b), of DEVB TC(W) No. 3/2023 requires a unique digital ID code on every site plant, MEWP, lifting appliance, lifting gear and powered tool. A scan shows its certification, examination and maintenance records, and an overdue item raises an alert. Kodifly supplies the tags, scanning and records on SpatialSense.

Last updated

What the circular requires, and how sites use it

Clause 5(12)(b)(i) asks for a digitised system that tracks, in real time, the current status of all site plants, Mobile Elevating Work Platforms (MEWPs), lifting appliances, lifting gears and powered tools. Status means the record of test certification, examination, checking and maintenance. The Buildings Department and CIC name the category as site plants, powered tools and ladders.

On site, each item arrives with a tag. A supervisor scans it with a phone before the item is used and sees whether its papers are in date. If they are not, the item is flagged before it is put to work, not after an inspector finds it. The records are kept on the platform and the contractor keeps them up to date.

Requirements in Annex A, clause 5(12)(b)

TopicClauseWhat it says
Scope(b)(i)All site plants, MEWPs, lifting appliances, lifting gears and powered tools used on the site.
Identity(b)(i)A unique digital identification code attached and secured to each item.
Scan(b)(i)Site supervisors and management scan the code with a mobile device. It shows certification, examination, checking and maintenance records from the platform.
Records(b)(i)The contractor updates and maintains the certification and maintenance records.
Alert(b)(ii)The device shows an alert for outdated certification, or examination, checking or maintenance that is overdue.
Message(b)(ii)An automatic SMS or in-app pop-up to site supervisors and the Safety Officer, with equipment ID, scan date and time, and status. Recorded at the platform.
MEWP register5(12)(i)(i)A register in the tracking system of every MEWP on site and whether it has smart monitoring, included in the monthly safety report.
LaddersSome contract specificationsTracking covers site plants, powered tools and ladders, with a digital ID on every ladder used on the site.

What some contract specifications add

Compliance matrices for recent Hong Kong public works score these beside clause 5(12)(b). SpatialSense meets each.

  1. Tracking duties

    • Industrial QR code and UHF RFID tags generated, supplied and fixed by the 4S supplier, and tags supplied by the contractor registered too.
    • Offline scanning on the mobile app, with equipment data shown locally in underground or blind areas.
    • Batch import and bulk upload of plant, tool and ladder records.
    • Automatic sync of the equipment database from the contractor's own systems.
    • The item's location placed on the site map when it is scanned.

Typical flow on a Hong Kong site

  1. Tag

    Each plant, lifting gear and tool gets a unique digital ID when it arrives.

  2. Load records

    Certificates, examination dates and maintenance history go into the platform.

  3. Scan

    A supervisor scans the tag before use and sees the current status.

  4. Alert

    Outdated or overdue items trigger a pop-up and an alert to supervisors and the Safety Officer.

  5. Update

    Once the item is examined or serviced, the record is updated and the alert closes.

How Kodifly supplies, installs and runs it

Tags, scanning and records come as one package, joined to the same platform as every other 4S device.

Devices, software and set-up together

  • QR code or UHF RFID tags with a unique digital ID

  • Ladders tracked where the contract lists them

  • Offline scanning and batch import

  • Scanning on supervisors' phones

  • Certificate and examination records on SpatialSense

  • Overdue alerts by SMS or in-app pop-up

  • Alert record for follow-up

  • MEWP register for the monthly report

  • Tagging and record loading at set-up

Plant and tool tracking, answered

What does the circular require for plant and tool tracking?

A digitised system with a unique ID code on every item, scan access to certification, examination, checking and maintenance records, and an automatic alert when any record is outdated or overdue (Annex A, clause 5(12)(b)).

Which equipment is covered?

All site plants, MEWPs, lifting appliances, lifting gears and powered tools used on the site (clause 5(12)(b)(i)). The Buildings Department and CIC describe the category as site plants, powered tools and ladders, and some contract specifications track ladders too.

Does tracking work underground?

Yes. The SpatialSense app reads QR codes offline and shows the stored equipment data in shafts, tunnels and other blind areas, then syncs when the network returns.

What triggers an alert?

Outdated certification, or examination, checking or maintenance that is overdue (clause 5(12)(b)(ii)).

Who receives the alert, and how?

Site supervisors and the Safety Officer, by SMS or in-app pop-up. The alert is recorded at the platform for follow-up and shows the equipment ID, scan date and time, and status (clause 5(12)(b)(ii)).

Where are the records kept?

On the centralised management platform, or on a control platform if the contract does not specify a CMP. The contractor updates certification and maintenance records there (clause 5(12)(b)(i)).

How does tracking relate to MEWPs?

The tracking system carries a register of every MEWP on site and whether it has smart monitoring fitted. The register goes in the monthly safety report (clause 5(12)(i)(i)).

More Smart Site Safety guides

  • 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
  • AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
  • Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
  • 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
  • Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
  • Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
  • API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
  • 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
  • Mobile plant alertDEVB TC(W) No. 3/2023 clause 5(12)(e): 360 degree sensors on excavators and cranes, a 2 m danger zone, 100 dB siren, and the BD mandatory rules for private works.
  • Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
  • Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
  • Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
  • VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
  • Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.

Tag your plant and tools

Tell us the plant, lifting gear and tools on site. We will plan the tagging and the records.