DEVB TC(W) No. 3/2023, Annex A 5(12)(e)
Mobile plant anti-collision: danger zone alert for excavators and cranes
Clause 5(12)(e) of DEVB TC(W) No. 3/2023, Annex A, requires an automated warning system on all mobile plant, with sensors giving 360 degree cover of a danger zone generally at least 2 m from any part of the machine. A person entering it triggers a cab warning, a siren of at least 100 dB and an alert to supervisors. Kodifly fits and runs it.
Last updated
What the circular requires, and where it is mandatory
The circular asks for an automated warning system on all mobile plant, including excavators, crawler cranes and mobile cranes. It warns the operator, and any person who steps into the danger zone, of the risk of being run over or hit by moving parts (clause 5(12)(e)). The Safety Officer sets the danger zone by risk assessment. The Buildings Department and CIC name it the unsafe acts and dangerous situation alert for the mobile plant operation danger zone.
The requirement now reaches private works. Since July 2024 the Buildings Department attaches conditions to building works above HK$30 million that use mobile plant and tower cranes, so registered contractors must use the 4S Mobile Plant Alert System and Tower Crane Alert System. Since July 2025 it also covers demolition, excavation and lateral support, foundation and site formation works (LCQ13, 24 June 2026).
Requirements in Annex A, clause 5(12)(e), mobile plant
| Topic | Requirement |
|---|---|
| Scope | All mobile plant operating on site, including excavators, crawler cranes and mobile cranes. |
| Sensor cover | Enough sensors on the chassis and movable superstructure for full 360 degree cover of the danger zone perimeter. |
| Danger zone | Set by the Safety Officer from the risk assessment. Generally not less than 2 m from any part of the plant. Some contract specifications say in no case less than 2 m. |
| In the cab | A warning light on the dashboard and a spoken message by speaker or headphone telling the operator to stop all plant operation. |
| At the machine | A roof siren with flashing red light and continuous warning of at least 100 dB. It switches off when the person leaves the zone. |
| Alert message | SMS or in-app pop-up to site supervisors and the Safety Officer, recorded at the platform with the date and time of the encroachment. |
| Video clip | Required in the alert message: a clip from 15 seconds before the encroachment to 10 seconds after the person leaves (clause 5(12)(e)(ii)). |
| Accuracy | At least 90% accuracy, proved by a live trial (clause 5(2)). |
When someone enters the danger zone
Detect
A sensor on the chassis or superstructure picks up a person inside the zone.
Warn the operator
A dashboard light flashes and a spoken message says stop all operation.
Warn the person
The roof siren sounds at 100 dB or more with a flashing red light.
Alert
Supervisors and the Safety Officer get an SMS or pop-up with the date, time and video clip.
Clear
When the person leaves the zone, the signals switch off automatically.
What some contract specifications add
Compliance matrices for recent Hong Kong public works list these beside clause 5(12)(e). Kodifly meets each.
Plant duties
- A danger zone of in no case less than 2 m, a hard minimum rather than general guidance.
- An API link to the 360 degree plant camera brands in common use in Hong Kong.
- Each newly arrived machine connected to the platform within 1 working day.
- Rugged mounting brackets, weatherproof enclosures and power wiring for the contractor's plant.
- A 25-second video buffer around each incident: 15 seconds before and 10 seconds after.
How Kodifly supplies, installs and runs it
Sensors, cab unit, siren and platform link are fitted to each machine as one project.
Devices, software and installation together
Sensors for 360 degree cover on each machine
Cab light and spoken warning for the operator
Roof siren and flashing red light
Danger zones set with the Safety Officer
Live trial to show the accuracy the clause asks for
Alerts to supervisors and the Safety Officer
Event record with the video clip on the platform
Mobile plant anti-collision, answered
What does the circular require for mobile plant?
An automated warning system on all mobile plant, with 360 degree sensor cover of the danger zone, a cab warning, a roof siren of at least 100 dB and an alert to supervisors (Annex A, clause 5(12)(e)).
How big is the danger zone?
The Safety Officer decides it from the risk assessment. It should generally be not less than 2 m from any part of the mobile plant (clause 5(12)(e)).
How loud must the siren be?
At least 100 dB, with a flashing red light, switching off automatically when the person leaves the danger zone (clause 5(12)(e)).
Is a video clip required?
Yes. The alert message must include a video clip capturing the person from 15 seconds before the encroachment until 10 seconds after they leave the danger zone (clause 5(12)(e)(ii)). Kodifly attaches the clip to every alert on the platform.
Is it mandatory on private building works?
Yes for building works above HK$30 million that use mobile plant. The Buildings Department imposes it as a condition, and since July 2025 it also applies to demolition, excavation and lateral support, foundation and site formation works (LCQ13, 24 June 2026).
Is there funding for plant owners?
The Construction Innovation and Technology Fund extended eligibility to local mobile plant and tower crane rental companies in 2024, with a ceiling of HK$7.5 million per company for danger zone alert systems (LCQ13, 24 June 2026).
Related guides
More Smart Site Safety guides
- 4S and DWSSHow the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.
- AI cameraDEVB TC(W) No. 3/2023 clause 5(12)(g): the unsafe scenarios an AI camera must detect, the 80% test and 90% average accuracy, 1 second alarms and video records.
- Centralised platformWhat DEVB TC(W) No. 3/2023 requires of the 4S centralised management platform (CMP): 30 users, 3 months of data, security, and the alerts every device sends it.
- 4S componentsThe twelve 4S components in DEVB TC(W) No. 3/2023 Annex A, what each must do, and the rules that apply to every device. Kodifly delivers the set complete.
- Confined spaceDEVB TC(W) No. 3/2023 clause 5(12)(h): worker counting, PPE checks and oxygen, gas and temperature monitoring for confined spaces under Cap. 59AE.
- Contract variantsHow 4S requirements vary between Hong Kong contract specifications: 12 or 9 components, 2 or 15 AI cameras, 70 or 100 dB sirens and extra data duties. Kodifly meets both.
- API and dataHow a 4S platform shares and protects data: API access, OpenAPI v3, single sign-on, SFTP data hub, DWSS links, Tier 3 hosting and data return at the end of the contract.
- 4S Labelling SchemeGetting a 4S label, step by step: the main contractor applies, CIC inspects the site, and the process takes about 3 months. One-year validity, renewal and confiscation.
- Permit-to-workWhat DEVB TC(W) No. 3/2023 clause 5(12)(c) requires of a digitised permit-to-work system: the high-risk activities, live mobile status and expiry alerts.
- Plant and tool trackingDEVB TC(W) No. 3/2023 clause 5(12)(b): a unique digital ID on every plant, MEWP, lifting gear and powered tool, with scan checks and overdue alerts.
- Smart lockDEVB TC(W) No. 3/2023 clause 5(12)(d): electronic locks and keys on electrical cabinets, floor openings, lift shafts and confined spaces, with siren and alerts.
- Tower crane alertDEVB TC(W) No. 3/2023 clause 5(12)(e): the tower crane loading and unloading danger zone of at least 7 m from the hook, 3 m clearance, 100 dB siren and alerts.
- VR safety trainingDEVB TC(W) No. 3/2023 clause 6: half-yearly VR safety training for workers in eight high-risk activities, accepted content, hardware and training records.
- Worker monitoringDEVB TC(W) No. 3/2023 clause 5(12)(f): wearables for every worker with location, standstill, temperature and heart rate alerts, and privacy limits.
Fit your mobile plant
Tell us the machines on your site. We will plan the sensors, cab units and sirens.