DEVB TC(W) No. 8/2025

DWSS glossary: terms in TC(W) No. 8/2025

This glossary defines the terms used in DEVB TC(W) No. 8/2025 and its Annex A, including DWSS, iCWP, RISC, SDM, EDMS and NEC. Each entry cites the paragraph or annex clause it comes from. Where a term comes from a related DEVB document, the entry names it.

Last updated

How to read this glossary

The circular and Annex A use full names in most places. Short forms such as SCM are used in this guide for brevity. The circular prevails over any definition here, and each row cites where the wording comes from.

DWSS terms

TermFull nameMeaningSource
DWSSDigital Works Supervision SystemA centralised construction management platform for submission and approval workflows, contract management, supervision and monitoring. It is also the platform for smart site applications.Annex A 1.1.1, para 9
iCWPIntegrated Capital Works PlatformDEVB's platform, developed in phases, that collects and consolidates data from the DWSS and other digital systems.Para 17
DSRData Standardisation Report for DWSSThe DEVB living document that sets the datasets sent from the DWSS to iCWP. Version 1.2 is dated December 2025.Para 17, DSR
RISCRequest for Inspection/Survey CheckThe first of the six mandatory modules.Annex A 1.2.1
SCMSmart Construction ManagementThe data hub that collects and consolidates data from smart site applications such as IoT devices, remote sensors, AI applications and smart carry-on devices.Annex A 1.3.1
SDMSmart Document ManagementA web-based, workflow-enabled component for formal project documents such as correspondence, submissions, drawings and reports.Annex A 1.4.1
EDMSElectronic Document Management SystemA separate system contractors no longer have to procure, because SDM fulfils the requirement.Paras 6(a), 11
SSSS or 4SSmart Site Safety SystemDEVB circulars write SSSS. Kodifly's guides write 4S. Where both apply, the SSSS central platform is merged into the SCM hub.Para 7 footnote 1
CSPCo-supervision PlatformDEVB's SmartEye platform for remote supervision, set out in TC(W) No. 1/2026. It connects to the SCM hub through an API or other means.TC(W) No. 1/2026
NECNew Engineering ContractA contract form that the Contract Management module supports. The DSR lists NEC3, NEC4 and the NEC Hong Kong Edition.Annex A 7.5.1(vi)(a), DSR 2.7.1
PTEPre-tender estimateThe estimate that sets the HK$30 million threshold and the cost ceiling. The circular writes the term in full.Paras 1, 8, 12
Employer's representativeThe Architect, the Engineer, the Supervising Officer, the Project Manager or the likeThe person who reviews the DWSS proposal and appoints the project team member.Para 13, footnote 3
RSSResident site staffAppointed to manage the DWSS on site, at professional rank, or at inspectorate rank where justified and supported by the professional-rank project team member.Annex A 3.2.2
MDMMobile device managementSoftware to distribute, upgrade, manage and wipe DWSS apps and data on registered mobile devices.Annex A 5.6.1
RPORecovery Point ObjectiveThe most data loss allowed after a failure. The Annex sets it at not more than 24 hours.Annex A 2.4.6
CE, PMI, EWCompensation Event, Project Manager's Instruction, Early WarningThe contract workflows in the Contract Management module.Annex A 7.5.1(vi)

Where each term shows up in SpatialSense

Kodifly delivers the whole DWSS as one project, built to Annex A.

Built to Annex A

  • Workflow Management modules

  • Smart Construction Management hub

  • Smart Document Management

  • API to iCWP

  • Web, iOS and Android apps

DWSS terms, answered

What does DWSS stand for?

Digital Works Supervision System. DEVB requires it on capital works contracts with a pre-tender estimate above HK$30 million tendered on or after 1 April 2026 (paragraphs 1 and 8).

What is the difference between SCM and SDM?

Smart Construction Management is the data hub for smart site applications. Smart Document Management is the component for formal project documents. Both sit beside Workflow Management (paragraph 7).

Is 4S the same as SSSS?

Yes. DEVB circulars write SSSS for the Smart Site Safety System, and Kodifly's guides write 4S. With a DWSS, the SSSS central platform joins the SCM hub (paragraph 7, footnote 1).

What is the DSR and where is it published?

The Data Standardisation Report for DWSS is published on the DEVB website. The circular calls it a living document that DEVB updates (paragraph 17, Annex A 11.1.5).

Who is the employer's representative?

The Architect, the Engineer, the Supervising Officer, the Project Manager or the like, as defined under the contract (paragraph 13, footnote 3).

More DWSS guides

  • Cleansing inspectionWhat the DWSS Cleansing Inspection Checklists module must do under TC(W) No. 8/2025 Annex A: daily and weekly checklists, records, workflow, statistics and SpatialSense.
  • Contract managementWhat the DWSS Contract Management module must do under TC(W) No. 8/2025 Annex A: compensation events, early warnings, payment, programme, NEC Health Check data.
  • How to chooseHow to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.
  • iCWP data standardHow a DWSS feeds DEVB's iCWP under TC(W) No. 8/2025. The data standardisation rule, the 24-hour API clause, what data flows and how SpatialSense meets it.
  • Labour ReturnWhat the DWSS Labour Return module must do under TC(W) No. 8/2025 Annex A: every G.F. 527 field, retrieval from the Site Diary, workflow, statistics and SpatialSense.
  • RISCThe RISC form in the DWSS under TC(W) No. 8/2025 Annex A 7.5: the form it digitises, fields, workflow and sign-off, dashboard, and how SpatialSense delivers it.
  • Site DiaryWhat the DWSS Site Diary module must do under TC(W) No. 8/2025 Annex A 7.5: G.F. 536, Site Record Book, content, workflow, statistics, and how SpatialSense delivers it.
  • Site safety inspectionWhat the DWSS Site Safety Inspection Records module must do under TC(W) No. 8/2025 Annex A: safety walks, performance records, workflow, statistics and SpatialSense.
  • Smart construction managementSmart construction management in the DWSS under TC(W) No. 8/2025: the SCM hub, alerts, dashboards, iCWP data within 24 hours, the AI tool, and how SpatialSense meets it.
  • TC(W) No. 8/2025DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.
  • Tender checklistA clause-by-clause checklist of DEVB TC(W) No. 8/2025 Annex A for DWSS tenders: proposal contents, access, security, backup, availability, timeline, handover and AI.

Ask about a term on your contract

Send us the clause or the term. We will show where it sits in SpatialSense.