DEVB TC(W) No. 8/2025, paragraph 17 and Annex A 1.7.2

DWSS iCWP integration and the iCWP data standard

Under DEVB TC(W) No. 8/2025, selected DWSS data must be standardised and sent to the Integrated Capital Works Platform (iCWP) according to the Data Standardisation Report for DWSS (paragraph 17). Annex A 1.7.2 adds that all collected data must be available to iCWP by API within 24 hours. Kodifly builds SpatialSense to meet both.

Last updated

What the circular requires

DEVB is developing the Integrated Capital Works Platform (iCWP) in phases to collect and consolidate data from the DWSS and other digital systems, for continuous monitoring and data analysis (paragraph 17). Selected DWSS data must be standardised and transferred to iCWP according to the Data Standardisation Report for the DWSS (DSR). The circular calls the DSR a living document that DEVB updates as appropriate.

Two Annex A clauses carry the duty. Clause 1.7.2 says all data collected must be available to third-party applications, including iCWP, through an API or web services such as RESTful within 24 hours. Clause 11.1.5 makes the contractor responsible for uploading the required data automatically to iCWP at a daily interval.

The DSR is published on the DEVB website. The current version is 1.2, dated December 2025. Its amendment history lists version 1.0 (February 2023), version 1.1 (June 2024, which added Contract Management and DWSS System Information) and version 1.2, which adds Smart Document Management and NEC Health Check data. The DEVB listing shows the report in English only.

How data reaches iCWP

The route from a site record to the platform, with the clause behind each step.

  1. Register the upload

    Department project officers register a new data upload through the iCWP website, which is for government internal access only (DSR 1.5.1).

  2. Capture in original fields

    Text, numbers, dates and locations sit in database fields, so records can be indexed, searched and reported (Annex A 1.7.1).

  3. Standardise to the DSR

    Each dataset follows the DSR schema. XML is the recommended exchange format (DSR 4.1.1).

  4. Upload daily, expose by API

    The contractor arranges the daily upload (11.1.5). All collected data is also reachable by API within 24 hours (1.7.2).

What data flows to iCWP

DSR section 1.6.2 lists the datasets. The figures below are examples from each module, not the full list. The last row covers Smart Construction Management data, which follows the same rule.

ReferenceModuleExamples of what iCWP collects
DSR 4.3RISCNon-conformance and urgent counts, average elapsed time, revisions, overdue forms, first-inspection failure rate, raw data
DSR 4.4Site DiaryOverdue and completed diaries, contractor's staff, labour and plant numbers, raw data
DSR 4.5Site Safety Inspection RecordsNon-compliance, near-miss and incident reports, accident rate, convictions, late rectifications
DSR 4.6Cleansing Inspection RecordsCompleted and incomplete inspections, non-compliance, average elapsed time
DSR 4.7Labour ReturnNumber of labour employed, wage rates per trade
DSR 4.8Contract ManagementFinancial and programme status, early warnings, compensation events, NEC Health Check data (G1 to G6)
DSR 4.9DWSS System InformationNumber of users, active modules
DSR 4.10Contractor's Submission (SDM)Commenting time, overdue response rate, approval duration, revisions
DSR 4.11Raw Document (SDM)Document metadata
Annex A 1.7, 8.2; latest DSRSmart Construction ManagementEvents and alerts with date, time, location, type and frequency, relevant parties and description. Readings such as Alert-Alarm-Action exceedances. Photos and short videos linked by storage path and metadata

Sources: Data Standardisation Report for DWSS, version 1.2, December 2025, DEVB; TC(W) No. 8/2025 Annex A 1.7, 8.2 and 8.3 for the Smart Construction Management row.

Format rules in DSR section 4

The technical rules a DWSS must follow when it builds the iCWP dataset.

Exchange format
XML recommended, embedded and sent by JSON, SOAP or SFTP (4.1.1)
SFTP file name
Project No-Contract No-Dataset ID-Timestamp.xml, Hong Kong time (4.1.2)
Encoding
UTF-8 recommended, with ISO/IEC 10646 and HKSCS for Chinese characters (4.1.3)
Record identifier
Project No-Contract No-Module-Form-YYYYMMDD-System Gen No (4.2.1)

The DSR leaves out transfer frequency and exception handling. Annex A 11.1.5 sets the daily interval.

How SpatialSense meets the iCWP requirements

Kodifly builds SpatialSense to the clauses below and sets up the iCWP connection as part of the DWSS project.

Built to Annex A

  • Original-format data fields (1.7.1)

  • Data by API within 24 hours (1.7.2)

  • Daily upload to iCWP (11.1.5)

  • API libraries and documentation (11.1.1, 11.4.6)

  • Unique identifier on every record (7.3.2)

  • Interfacing IDs for BIM models (11.1.6)

  • Audit trail for every change (4.3.1)

Mapped once, sent every day.

Each DWSS dataset is mapped to the iCWP data standard field by field. A log records every daily send and shows it went within 24 hours.

iCWP integration, answered

What is iCWP?

iCWP is the Integrated Capital Works Platform that DEVB is developing in phases to collect and consolidate data from the DWSS and other digital systems for continuous monitoring and data analysis (paragraph 17).

What is the DWSS data standard?

It is the Data Standardisation Report for DWSS, which sets the datasets, data fields and technical rules for sending DWSS data to iCWP. DEVB publishes it and updates it from time to time. Version 1.2 is dated December 2025.

Does the DWSS have to send data to iCWP every day?

Annex A 11.1.5 makes the contractor responsible for uploading the required data automatically to the dedicated server or location, such as iCWP, at a daily interval, following the formats in the latest DSR.

What does the 24-hour clause mean?

Annex A 1.7.2 requires all collected data to be available to third-party applications, including iCWP, by API or web services within 24 hours. It is an availability duty on the data, separate from the daily upload.

Which data format does iCWP expect?

The DSR recommends XML for exchange, embedded and sent by JSON, SOAP or SFTP, with UTF-8 encoding (4.1.1 and 4.1.3). Use the latest DSR version on the DEVB website, because the circular calls it a living document.

Does Smart Construction Management data go to iCWP?

Yes. Annex A 1.7.2 covers all data collected, and the SCM hub is part of the DWSS (1.3.1). SCM data is kept in its original format in database fields, with photos and videos linked by storage path and metadata (8.2.3, 8.2.4). Recent Hong Kong public works contract specifications state it directly. SCM data goes to iCWP by API within 24 hours, standardised to the Data Standardisation Report. SpatialSense applies the same 24-hour API and DSR mapping to SCM data as to the six modules.

Does an older DWSS need to change for DSR 1.2?

Paragraph 1 says contracts tendered before 1 April 2026 implement the enhancements as far as practicable. Version 1.2 adds Smart Document Management and NEC Health Check data, so check your contract and the employer's representative.

More DWSS guides

  • Cleansing inspectionWhat the DWSS Cleansing Inspection Checklists module must do under TC(W) No. 8/2025 Annex A: daily and weekly checklists, records, workflow, statistics and SpatialSense.
  • Contract managementWhat the DWSS Contract Management module must do under TC(W) No. 8/2025 Annex A: compensation events, early warnings, payment, programme, NEC Health Check data.
  • GlossaryA sourced glossary of DWSS terms in Hong Kong public works: DWSS, iCWP, DSR, RISC, SCM, SDM, EDMS, SSSS or 4S, CSP, NEC and PTE, with the circular paragraph for each.
  • How to chooseHow to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.
  • Labour ReturnWhat the DWSS Labour Return module must do under TC(W) No. 8/2025 Annex A: every G.F. 527 field, retrieval from the Site Diary, workflow, statistics and SpatialSense.
  • RISCThe RISC form in the DWSS under TC(W) No. 8/2025 Annex A 7.5: the form it digitises, fields, workflow and sign-off, dashboard, and how SpatialSense delivers it.
  • Site DiaryWhat the DWSS Site Diary module must do under TC(W) No. 8/2025 Annex A 7.5: G.F. 536, Site Record Book, content, workflow, statistics, and how SpatialSense delivers it.
  • Site safety inspectionWhat the DWSS Site Safety Inspection Records module must do under TC(W) No. 8/2025 Annex A: safety walks, performance records, workflow, statistics and SpatialSense.
  • Smart construction managementSmart construction management in the DWSS under TC(W) No. 8/2025: the SCM hub, alerts, dashboards, iCWP data within 24 hours, the AI tool, and how SpatialSense meets it.
  • TC(W) No. 8/2025DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.
  • Tender checklistA clause-by-clause checklist of DEVB TC(W) No. 8/2025 Annex A for DWSS tenders: proposal contents, access, security, backup, availability, timeline, handover and AI.

Check your iCWP data flow

Send us the contract and the employer's department. We will show how SpatialSense maps to the DSR for your modules.