DEVB TC(W) No. 8/2025, Annex A 7.5.1(v)

DWSS Labour Return module: G.F. 527

The Labour Return module is the fifth mandatory DWSS module in DEVB TC(W) No. 8/2025 (Annex A 7.5.1(v)). It must carry every data field of the active G.F. 527, the monthly return of site labour deployment and wage rates, and pull labour figures from the Site Diary. Kodifly delivers it in SpatialSense.

Last updated

What the module is

Annex A 7.5.1(v)(a) says the Labour Return Record refers to G.F. 527 under DEVB TC(W) No. 3/2003A, the Monthly Return of Site Labour Deployment and Wage Rates for Construction Works. The forms must include all data fields in the active G.F. 527 (7.5.1(v)(b)).

The module must calculate project-specific fields and dates automatically, avoid repeated entry of similar fields (7.5.1(v)(c)), and retrieve labour resource information from the Site Diary or Site Record Book (7.5.1(v)(d)). Output must be configurable to the standard form, with G.F. 527 named as the example (10.3.6).

G.F. 527 fields in the iCWP dataset

The DSR (section 4.7, tables 4-29b and 4-29c) lists the fields. Both G.F. 527 Rev. 1/2003 and Rev. 1/2017 forms are transferred.

Field groupFields
ContractForm version, department, division, year, month, contract number, contract title, contractor, nominated sub-contractor (Y or N), works code
TradesTrade name, trade division, trade code
LabourNumber of workers engaged on site on each calendar day, total mandays, overtime
WagesDaily wage rate: average, high and low
Contractor sign-offAgent of contractor: name, telephone number, completed date
Works sign-offIOW or COW: name, telephone number, checked date
Project officerName, post title, telephone number, email address

Source: Data Standardisation Report for DWSS, version 1.2, December 2025.

Workflow and who signs

Annex A 7.5.1(v)(e) names four steps. The DSR form fields show three roles on the return. The workflow agreed with the employer's representative sets the actual route (7.4.4).

  1. Manual input

    Annex A lists manual input as the first step, alongside automatic retrieval of labour figures from the Site Diary (7.5.1(v)(d), (e)).

  2. Submit

    The agent of the contractor completes the return and submits it through the workflow (7.5.1(v)(e)).

  3. Acknowledge

    The IOW or COW records a checked date on the return, and the acknowledgement is logged. Each action is time-stamped (7.3.8).

  4. Respond to enquiry

    Enquiries on the return are answered inside the workflow, so the history stays with the record (7.5.1(v)(e)).

How SpatialSense does it

SpatialSense is built to Annex A 7.5.1(v), and Kodifly delivers it as part of the complete DWSS.

Built to Annex A

  • All G.F. 527 data fields

  • Labour retrieved from the Site Diary

  • Automatic calculation of dates and totals

  • Submit and acknowledge workflow

  • Labour and wage statistics

  • Data to iCWP

The labour return builds itself.

Site attendance records become man-days and workers by trade. Check the month, then submit it with the site records.

Labour Return module, answered

Which form does the Labour Return module use?

G.F. 527, the Monthly Return of Site Labour Deployment and Wage Rates for Construction Works, under DEVB TC(W) No. 3/2003A (Annex A 7.5.1(v)(a)).

Must every G.F. 527 field be included?

Yes. The forms must include all data fields listed in the active G.F. 527 (7.5.1(v)(b)). The DSR transfers both the Rev. 1/2003 and Rev. 1/2017 versions to iCWP.

Where do the labour numbers come from?

The Labour Return forms must allow automatic retrieval of labour resources information from the Site Diary or Site Record Book (7.5.1(v)(d)).

What statistics must the module show?

An analytical summary and status of the number of labour deployed and the wage rates of workers (7.5.1(v)(f)).

What does iCWP receive?

DSR section 4.7 sets two datasets. One is the number of labour employed in a period. The other is the wage rates of workers per trade, drawn from the G.F. 527 forms.

Does it apply to ArchSD contracts?

The DSR says its Labour Return template does not apply to ArchSD contracts and that a system-to-system interface with ArchSD's eIRS may need to be considered (DSR 2.6.2).

More DWSS guides

  • Cleansing inspectionWhat the DWSS Cleansing Inspection Checklists module must do under TC(W) No. 8/2025 Annex A: daily and weekly checklists, records, workflow, statistics and SpatialSense.
  • Contract managementWhat the DWSS Contract Management module must do under TC(W) No. 8/2025 Annex A: compensation events, early warnings, payment, programme, NEC Health Check data.
  • GlossaryA sourced glossary of DWSS terms in Hong Kong public works: DWSS, iCWP, DSR, RISC, SCM, SDM, EDMS, SSSS or 4S, CSP, NEC and PTE, with the circular paragraph for each.
  • How to chooseHow to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.
  • iCWP data standardHow a DWSS feeds DEVB's iCWP under TC(W) No. 8/2025. The data standardisation rule, the 24-hour API clause, what data flows and how SpatialSense meets it.
  • RISCThe RISC form in the DWSS under TC(W) No. 8/2025 Annex A 7.5: the form it digitises, fields, workflow and sign-off, dashboard, and how SpatialSense delivers it.
  • Site DiaryWhat the DWSS Site Diary module must do under TC(W) No. 8/2025 Annex A 7.5: G.F. 536, Site Record Book, content, workflow, statistics, and how SpatialSense delivers it.
  • Site safety inspectionWhat the DWSS Site Safety Inspection Records module must do under TC(W) No. 8/2025 Annex A: safety walks, performance records, workflow, statistics and SpatialSense.
  • Smart construction managementSmart construction management in the DWSS under TC(W) No. 8/2025: the SCM hub, alerts, dashboards, iCWP data within 24 hours, the AI tool, and how SpatialSense meets it.
  • TC(W) No. 8/2025DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.
  • Tender checklistA clause-by-clause checklist of DEVB TC(W) No. 8/2025 Annex A for DWSS tenders: proposal contents, access, security, backup, availability, timeline, handover and AI.

See a G.F. 527 return in SpatialSense

Send us your contract and the G.F. 527 revision you use. We will show the return filled from the Site Diary.