DEVB TC(W) No. 8/2025, Annex A 7.5.1(ii)

DWSS Site Diary module: G.F. 536 and Site Record Book

The Site Diary module is the second mandatory DWSS module in DEVB TC(W) No. 8/2025 (Annex A 7.5.1(ii)). It digitises G.F. 536, or the ArchSD Site Record Book, with a record, review and endorse workflow, site photos, and statistics on labour, plant and weather. Kodifly delivers it in SpatialSense.

Last updated

What the Site Diary module is

Annex A 7.5.1(ii) says the Site Diary refers to G.F. 536 and the Site Record Book refers to the ArchSD Site Record Book. In the DWSS filing format they carry the type codes SD and SRB (7.3.4).

The module is the daily record of the site. Its labour and plant figures also feed the Labour Return module, which must retrieve labour information from the Site Diary automatically (7.5.1(v)(d)). Photo records must be part of the form.

What each diary records

Annex A 7.5.1(ii)(c) lists five items the form must be set up to record.

Record itemWhat the form holdsWhere it goes next
Progress of workWork done on the daySite Diary statistics
Plant and labour employedLabour and plant on siteLabour Return, and iCWP staff, labour and plant numbers
Weather and site conditionsConditions that affect the worksWeather statistics
Site photosPhoto records with date, time and GPS (7.4.9)The same form
Occurrences affecting progress or qualityWhat happened and the extent of the effectRaw Site Diary data

Workflow and who signs

Annex A 7.5.1(ii)(b) sets three stages. The workflow agreed with the employer's representative, within six weeks of commencement, names the people (7.4.4).

  1. Record

    The site team creates the diary on the app or browser. A draft can be saved and edited before submission (7.3.6).

  2. Review

    The assigned reviewer receives the diary through the workflow and gets a notification (7.1.3).

  3. Endorse

    The endorsing party signs off. The record is then locked, and each action carries its approver and time (7.3.7, 7.3.8).

Statistics the module must show

Annex A 7.5.1(ii)(e) sets the Site Diary statistics. The DSR (section 4.4) sets what goes to iCWP.

Annex A statisticWhat iCWP receives (DSR 4.4)
Overdue actionsNumber of overdue Site Diary in a period
Completed, incomplete and outstanding diariesNumber completed and incomplete in a period
Labour and plant deploymentNumber of contractor's staff, labour and plant
Weather conditionsNot listed separately. The raw Site Diary data is collected
Instructions issued to the ContractorNot listed separately. The raw Site Diary data is collected

The DSR notes that its sample Site Diary template does not apply to ArchSD contracts.

How SpatialSense does it

SpatialSense is built to Annex A 7.5.1(ii), and Kodifly delivers it as part of the complete DWSS.

Built to Annex A

  • G.F. 536 and Site Record Book forms

  • Record, review and endorse workflow

  • Photos dated and placed on the plan

  • Labour feed to the Labour Return

  • Diary statistics dashboard

  • Data to iCWP

Fill the diary on site, even offline.

Weather, labour by trade and plant go in on a phone without signal. The diary is signed on the device and syncs when it reconnects.

Site Diary module, answered

Which form does the Site Diary module digitise?

G.F. 536 for the Site Diary, and the ArchSD Site Record Book for ArchSD contracts (Annex A 7.5.1(ii)(a)).

What must a diary record?

Progress of work, plant and labour employed, weather and site conditions, site photos, and any occurrence that affects progress or quality and the extent of the effect (7.5.1(ii)(c)).

What is the workflow?

Recording, review and endorsement (7.5.1(ii)(b)). Forms can be created, submitted, received, approved, rejected and answered on the mobile app and in a browser (7.4.5).

Does the Site Diary feed the Labour Return?

Yes. The Labour Return forms must allow automatic retrieval of labour resource information from the Site Diary or Site Record Book (7.5.1(v)(d)).

What does the Site Diary send to iCWP?

DSR section 4.4 lists overdue diaries, completed and incomplete diaries, numbers of contractor's staff, labour and plant, and the raw Site Diary data.

Can a diary be changed after endorsement?

Not directly. Submitted, reviewed or approved records are locked, and changes are made through rejection and resubmission that supersedes the earlier record (7.3.7).

More DWSS guides

  • Cleansing inspectionWhat the DWSS Cleansing Inspection Checklists module must do under TC(W) No. 8/2025 Annex A: daily and weekly checklists, records, workflow, statistics and SpatialSense.
  • Contract managementWhat the DWSS Contract Management module must do under TC(W) No. 8/2025 Annex A: compensation events, early warnings, payment, programme, NEC Health Check data.
  • GlossaryA sourced glossary of DWSS terms in Hong Kong public works: DWSS, iCWP, DSR, RISC, SCM, SDM, EDMS, SSSS or 4S, CSP, NEC and PTE, with the circular paragraph for each.
  • How to chooseHow to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.
  • iCWP data standardHow a DWSS feeds DEVB's iCWP under TC(W) No. 8/2025. The data standardisation rule, the 24-hour API clause, what data flows and how SpatialSense meets it.
  • Labour ReturnWhat the DWSS Labour Return module must do under TC(W) No. 8/2025 Annex A: every G.F. 527 field, retrieval from the Site Diary, workflow, statistics and SpatialSense.
  • RISCThe RISC form in the DWSS under TC(W) No. 8/2025 Annex A 7.5: the form it digitises, fields, workflow and sign-off, dashboard, and how SpatialSense delivers it.
  • Site safety inspectionWhat the DWSS Site Safety Inspection Records module must do under TC(W) No. 8/2025 Annex A: safety walks, performance records, workflow, statistics and SpatialSense.
  • Smart construction managementSmart construction management in the DWSS under TC(W) No. 8/2025: the SCM hub, alerts, dashboards, iCWP data within 24 hours, the AI tool, and how SpatialSense meets it.
  • TC(W) No. 8/2025DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.
  • Tender checklistA clause-by-clause checklist of DEVB TC(W) No. 8/2025 Annex A for DWSS tenders: proposal contents, access, security, backup, availability, timeline, handover and AI.

See a Site Diary in SpatialSense

Send us your contract type. We will walk through the diary, its photos and its statistics.