Body-worn camera requirement on Hong Kong public works: who wears it, from when and why
Since June 2026, DEVB has required the frontline personnel of resident site staff and of contractors, on all public works contracts, to be equipped with body-worn video cameras (BWVC) during site inspections (LC Paper No. CB(1)749/2026(02), paragraph 40). The stated aims are site supervision, safety management, quality control and works progress monitoring. Kodifly delivers the helmet camera and the dated inspection record.
Last updated
What DEVB has required
The requirement is stated in two official places. Paragraph 40 of LC Paper No. CB(1)749/2026(02), prepared for the Legislative Council Subcommittee to Study the Promotion of Occupational Safety and Health, says DEVB has required the frontline personnel of resident site staff (RSS) and contractors in all public works contracts to equip with BWVCs during site inspections since June 2026.
The second is LCQ13, a written reply by the Secretary for Development, Ms Bernadette Linn, to the Legislative Council on 24 June 2026. It says DEVB has recently required the frontline staff of resident site staff and contractors to equip with BWVCs during site inspections. The reply gives the reason: the technology has matured and BWVC use has become increasingly common in the construction industry.
The Secretary for Development repeated the requirement on 11 November 2026, in the reply to LCQ1 on the regulation of building works. Starting from June 2026, resident site supervisory staff and contractors' frontline management staff in all public works are required to be equipped with body-worn video cameras during inspections.
None of the sources gives a day in June, and none sets a contract value threshold. The duty is for site inspections, not a whole shift.
DEVB publishes no central specification. Government contracts now set one, and this page follows the current contract requirements. Recent public works contract specifications ask for a camera of 400 g or less, at least 256GB of storage, 9 hours of 1080p30 recording with audio, a bilingual notice, at least 7 days' retention and deletion 7 days after completion. The contract specification guide lists every item.
The requirement, point by point
What the two official sources say, and what they leave to your contract.
| Question | Official answer | Source |
|---|---|---|
| Who wears the camera | Frontline personnel of resident site staff and of contractors | Paragraph 40; LCQ13 reply, part (2) |
| Which contracts | All public works contracts. No value threshold is stated | Paragraph 40 |
| When it is worn | During site inspections | Paragraph 40; LCQ13 reply |
| From when | June 2026. No exact day is given | Paragraph 40 |
| Why | Site supervision, safety management, quality control and works progress monitoring | Paragraph 40; LCQ13 reply |
| Camera specification | No central DEVB specification. Contracts now set one: 400 g or less, 256GB, 9 hours of 1080p30 with audio | Current contract specifications |
Who counts as frontline
The papers do not define "frontline". Resident site staff are the supervising team on site, and paragraph 39 notes that some are employed directly by consultants.
Current contract specifications are more specific. They ask for at least 6 sets for the Client and the Project Manager, and enough for the contractor's foremen or equivalent, Safety Officers and Safety Supervisors. The allocation goes in the implementation plan, and everyone with a camera wears it during all site inspections.
Ask your project office which posts your contract means. Then count the people who inspect in a typical week, because each needs a camera at the time of inspection.
How Kodifly delivers it
A camera for each inspector
An Insta360 X6 on the safety helmet is worn hands-free and records the whole scene of the inspection.
A dated record
Each walk lands on the floor plan with date, time and capture ID, and links to the inspection request and site diary.
Body-worn camera requirement questions
Who must wear a body-worn camera on Hong Kong public works?
The frontline personnel of resident site staff and of contractors, on all public works contracts (LC Paper CB(1)749/2026(02), paragraph 40). The papers do not define "frontline", so confirm the posts with your project office.
Since when has DEVB required body-worn cameras?
Since June 2026 (paragraph 40). The Secretary for Development announced it in a written reply to the Legislative Council on 24 June 2026, which says DEVB "recently" made the requirement. No official source gives a day.
Which contracts does the requirement cover?
All public works contracts (paragraph 40). Unlike the Smart Site Safety System, which applies above HK$30 million, the papers state no contract value threshold for body-worn cameras.
When must the camera be worn?
During site inspections (paragraph 40). The papers do not ask for recording through a whole shift.
Why did DEVB introduce the requirement?
To enhance site supervision, safety management, quality control and works progress monitoring (paragraph 40). DEVB says the technology has matured and BWVC use has become common in the industry.
Is there an official camera specification?
DEVB publishes no central specification. Government contracts now set one, and this page follows the current contract requirements, from 400 g or less and 256GB of storage to deletion 7 days after completion. The contract specification guide lists every item.
Is it part of the Smart Site Safety System?
No. The LCQ13 reply raises it alongside the Smart Site Safety System (4S), but it is a separate DEVB requirement. The 4S rules are in TC(W) No. 3/2023.
Does it apply to private sites?
No. The papers speak only of public works contracts. For building works it regulates, the Buildings Department plans a separate measure in or before January 2027, a photo or video record of rebar before concreting (LCQ1, 11 November 2026). The rebar inspection records page explains it. A private client can still set camera terms in its own contract.
Related guides
Rebar inspection records
The Buildings Department's planned photo and video record before concreting.
More body-worn camera guides
- Contract specificationThe BWVC specification Hong Kong public works contracts now set: 400 g or less, 256GB, 9 hours of 1080p30 with audio, 7-day retention. Kodifly meets each item.
- Footage and privacyBody-worn camera footage of identifiable people is personal data under the PDPO. PCPD guidance applied to site footage, with a policy checklist.
- Inspection workflowA step-by-step site inspection video record workflow, from start of shift to retention. Footage is dated, placed on the floor plan and linked to DWSS records.
Send us your body-worn camera clause
Tell us the contract and clause. We will show the system, point by point, before the demo.