360 camera specification for construction: the published figures, side by side

The strictest published 360 camera specification for construction is in BCA's Guidebook for Virtual TOP/CSC (360 Capture). It sets at least 6K resolution, dual one-inch CMOS sensors, low-light capability, 60 to 90 minutes of continuous recording and six-axis stabilisation. Hong Kong public works contracts set 1080p at 30 fps, 9 hours of battery and 400 g or less for worn cameras. Japan's MLIT sets reference values for live video of 640 by 480 pixels at 15 fps. SpatialSense works with the Insta360 X4, X5 and X6 and the DJI Osmo 360, which all record 8K.

Last updated

Resolution
At least 6K (BCA, Singapore)
Sensors
Dual one-inch CMOS, low-light capable (BCA)
Battery
60 to 90 minutes continuous (BCA), 9 hours at 1080p30 (Hong Kong contracts)
Stabilisation
Six-axis (BCA)
Weight
400 g or less (Hong Kong contracts)
Live video
640 by 480 at 15 fps, average 1 Mbps (MLIT, Japan)

Three published specifications, three purposes

Each published figure answers a different use. Singapore's is for a stored capture that a regulator inspects in place of a visit, so it asks for the most detail. Hong Kong's is for a camera worn through a working shift, so it asks for battery life, storage and low weight. Japan's is for live video over a web conference, so it asks only for what a mobile connection can carry.

A specification for a tender should start from the use. If the record will be inspected or measured from, write the Singapore figures. If the camera is worn all day, add the Hong Kong ones. If supervisors watch live, add a minimum stream.

The published figures

From the issuing bodies' documents, checked in November 2026.

ItemSingapore, BCA guidebookHong Kong, public works contractsJapan, MLIT guidelines
PurposeStored 360 capture for TOP/CSC inspectionCamera worn on site inspectionsLive video for remote attendance and inspection
Camera type360 cameraBody-worn video camera. A helmet-integrated camera may be proposedVideo camera, such as a wearable or 360-degree camera
ResolutionAt least 6K1080p or higher640 by 480 or more. 1920 by 1080 for government building works
Frame rateNot stated30 fps or higher15 fps or more. 30 fps for government building works
SensorsDual one-inch CMOS, suitable for low lightLow-light recordingColour
Battery60 to 90 minutes of continuous video capture9 hours of continuous 1080p30 recordingNot stated
StorageOn the platform, tied to the building planAt least 256GB, 7 days of video and audioNot stated
StabilisationSix-axis, with image stabilisationNot statedNot stated
WeightNot stated400 g or lessNot stated
AudioNot statedBuilt-in microphones and speakersVideo and audio
StreamNot statedNot statedAverage 1 Mbps or more. 3 Mbps for government building works

Hong Kong's figures come from recent public works contract specifications. DEVB publishes no central camera specification, so the contract governs.

A 360 camera clause for a tender

Wording a client can adapt where no regulator sets the figures. Each item follows one of the published specifications above.

  1. The camera

    • A dual-lens 360 camera supporting at least 6K resolution
    • Dual one-inch CMOS sensors, suitable for low-light conditions
    • Six-axis stabilisation
    • At least 60 minutes of continuous capture on one battery, with spare batteries for the shift
    • Helmet, monopod or tripod mounting for hands-free capture
  2. The platform

    • Every capture tied to the approved floor plan, with its date and time
    • Continuous capture for large areas and spot capture for small rooms
    • Comments and photo evidence attached at the position they concern
    • Viewer access for the client, the consultant and the authority
    • A report of all comments and their closure
  3. The record

    • A walk of every accessible level at the stated interval
    • A walk before any work is covered
    • Footage stored securely, with an audit trail of who opens it
    • Retention and deletion periods stated in the contract

The cameras SpatialSense works with

Kodifly builds the software. These are the cameras it takes, with the makers' published figures.

Insta360 X4
8K 360 video, two 1/2-inch sensors
Insta360 X5
8K 360 video, two 1/1.28-inch sensors
Insta360 X6
8K 360 video, two 1/1.1-inch square sensors
DJI Osmo 360
8K 360 video, two 1/1.1-inch square sensors
Platform
SpatialSense, with every capture dated and placed on the floor plan
Security
Footage behind the project login, with an audit trail

Camera specification questions

What resolution does a 360 construction camera need?

At least 6K if the capture will be inspected by a regulator. That is the figure in section 4.1 of BCA's Guidebook for Virtual TOP/CSC (360 Capture). Hong Kong public works contracts set 1080p for worn cameras, and Japan's MLIT sets 640 by 480 for live video.

Why does BCA ask for one-inch sensors?

The guidebook pairs dual one-inch CMOS sensors with suitability for low-light conditions. Finished interiors, plant rooms and stair cores are often dim, and a larger sensor keeps the detail an inspector needs.

How long should the battery last?

BCA's guidebook sets 60 to 90 minutes of continuous video capture, enough for a walk of several floors. Hong Kong contracts set 9 hours of 1080p30 recording for a camera worn through a shift. Spare batteries cover a full day of 360 capture.

Is 5.7K enough for a 360 construction camera?

It falls short of BCA's 6K figure. Some contract specifications set 5.7K as their own minimum. A 6K camera meets both.

Which 360 camera should I choose for construction?

For a BCA virtual inspection, the one with the largest sensors, the Insta360 X6 or the DJI Osmo 360. Both record 8K with two 1/1.1-inch sensors, the closest to the guidebook's one-inch figure. For progress walks and Hong Kong worn-camera clauses, the Insta360 X4 or X5 records 8K, above those figures. SpatialSense works with all four.

Does the camera need stabilisation?

Yes for a walking capture. BCA's guidebook sets six-axis stabilisation with an image stabilisation algorithm, so the footage stays level and smooth at walking pace.

Can one camera serve as both the 360 camera and the body-worn camera?

Hong Kong contract specifications allow a camera that integrates with a smart safety helmet in place of a chest or shoulder camera, if it meets the rest of the clause. Kodifly's 360 helmet camera is offered on that basis.

What else should the specification cover besides the camera?

The platform and the record. BCA sets eight platform requirements, including tying every capture to the building plan, access for inspectors, comment tagging and a closure report. A camera without them produces footage, not a record.

More 360 camera guides

  • Middle East360 construction progress monitoring in Saudi Arabia, the UAE and Qatar: what Dubai Municipality and Ashghal require for site cameras and records.
  • Requirements by countryWhich countries require or accept 360 cameras and remote video for construction inspection: Singapore, Hong Kong, Japan, New Zealand, Dubai, Qatar and more, with sources.
  • Southeast Asia360 construction progress monitoring in Malaysia, Indonesia, Thailand, Vietnam and the Philippines. What each government publishes, and how Singapore's rule sets the bar.

Check your camera clause against the published figures

Send us the clause or the requirement. We will show you the camera, the platform and a capture that meets it.