Solutions

Product

 Back

Triumph at the 8th Belt and Road Summit 2023: A Glimpse into the Future, and Kodifly Proudly Played a Part!

News


 September 18, 2023


Triumph at the 8th Belt and Road Summit 2023: A Glimpse into the Future, and Kodifly Proudly Played a Part!

This event stands as a testament to our unwavering commitment to revolutionize infrastructure management and make a lasting impact on the industry.

Highlights of the Summit:

The 8th Belt and Road Summit, held from 13th - 14th of September 2023, is marked as a significant milestone in our journey towards innovation in infrastructure management. This event provided us with a  platform to foster valuable connections and share our vision and expertise with dedicated professionals who share our  passion to shape the future of infrastructure.  We also deeply appreciate the overwhelmingly positive response that we had received from the attendees.

Empowering Infrastructure with Kodifly

At Kodifly, our mission is to deliver top-tier infrastructure monitoring solutions. Through the integration of AI-driven analytics with advanced LiDAR and 3D Point Cloud technologies, we collect real-time data and leverage digital twin models for an in-depth analysis. This empowers us to provide actionable insights and predictive maintenance, allowing us to detect anomalies with immediate alerting for a wide range of infrastructures, including railways, highways, airports, and more.

Whether it's identifying potential hazards around railways or monitoring construction sites, our system ensures that infrastructure operates at its best!

Join our innovative journey

We invite all forward-thinking organizations to collaborate with Kodifly. By working together, we can drive innovation, efficiency, and sustainability in the infrastructure sector. If you have inquiries or seek exciting opportunities for collaboration on projects, please don't hesitate to reach out.

You can contact us through our website at www.kodifly.com/contact/) or send us an email at info@kodifly.com. Together, let's transform infrastructure management, build a safer and smarter future, and make a positive impact on the world. 

We're excited to share our remarkable success story from the 8th Belt and Road Summit, where we had the privilege of showcasing our cutting-edge Infrastructure Monitoring System.


Not Finding what you want?


    Transform with Kodifly

    Revolutionizing industries through cutting-edge 3D perception technology. Real-time monitoring, analysis, and insights for optimized operations.

© 2023 Kodifly. All rights reserved

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park, Pak Shek Kok, N.T., Hong Kong