Skip to content
Kodifly
Get a sample AI report

Kodifly | Spatial AI

AI that understands the built world.

Kodifly's AI reads public assets, infrastructure and works sites from every walk, flight and scan, and turns them into progress, evidence and answers that government bodies, operators, contractors and consultants can rely on.

Trusted by government agencies, rail operators and contractors on 100+ sites. Offices in Hong Kong, Singapore and Saudi Arabia.

Trusted across Asia and the Middle East

  • MTR
  • King Abdullah University of Science and Technology
  • Gammon
  • ADEC Advanced Company for Engineering Consultancy
  • Arup
  • Saudi Tech Engineering Consultants
  • China State Construction Engineering (Hong Kong)
  • INMA Energy
  • AECOM
  • Chun Wo
  • Binnies
  • Civil Engineering and Development Department

Working to a specific requirement?

Each compliance requirement has its own page, delivered complete on one SpatialSense record.

From a walk, a flight or a scan to a decision.

One AI and one dated record, whatever captures the site.

  1. See

    Walk with a 360 helmet camera, fly a drone, scan with handheld LiDAR or mount a ScanStation. Every capture is dated and placed on the plan.

  2. Understand

    The AI tags the objects it finds, lines up the same position on two dates, lists what changed and scores progress zone by zone.

  3. Remember

    Findings, issues, inspections and the site diary live in one dated record that is still there after the works are covered.

  4. Report

    The AI drafts progress, condition and safety reports for your experts to review, and you can ask the record questions in plain language.

Software

SpatialSense: the AI site record.

Every walk, flight and scan lands on the floor plan. The AI reads progress zone by zone, keeps dated evidence of works before they are covered and drafts the report for your team to review.

  • Progress by zone and by trade, against the programme.
  • Dated, located evidence of hidden works, for claims and defects.
  • AI-drafted reports, reviewed by your experts before they go out.

Explore SpatialSense

Illustrative floor plan. Progress scores are indicative visual assessments, not payment certifications.

Hardware

ScanStation: the AI's eyes on site.

A fixed LiDAR and camera unit on a pole, a tower crane or a facility watches the same ground day and night, and feeds the same record as your walks and drone flights.

  • The same view every day, in any light.
  • Change seen overnight, not at the next visit.
  • Made by Kodifly and installed by our own engineers.

Explore ScanStation

Same view every day
Change detected overnight
A Kodifly LiDAR and camera unit on a pan-tilt head, facing a hillside works site

Where our AI works.

One platform for the people who own, run and supervise public assets and infrastructure.

  • Facilities

    Assets and facilities

    Fixed LiDAR and AI that watch plants, pumping stations and tunnels, and keep a dated record of every change.

  • Energy

    Oil and gas

    Always-on LiDAR and AI over plants, pipeline corridors and hot work, with intrusion and change alerts.

  • Transport

    Rail and transport

    Round-the-clock monitoring of corridors, vegetation and nearby slopes, with alerts tied to dated measurements.

  • Geotechnical

    Slopes and environment

    Slope gradient, flexible barrier, excavation volume and environmental monitoring from one record.

  • Urban

    Urban management and public safety

    Computer vision and drone mapping for street-level assets, signage and public estates.

  • Government AI

    Government AI

    Ask your own records a question and get an answer linked to its sources.

  • Works

    Construction and works supervision

    Digital supervision, site capture and safety records for public works.

Deployment

Proven on public infrastructure.

Kodifly's engineers install, integrate and support our AI on government and infrastructure sites, from a single hillside to a whole works programme, in every market we serve.

  • Government agencies, infrastructure owners, rail operators, contractors and consultants.
  • Our own hardware and software, installed and supported by our own team.
  • Round-the-clock LiDAR monitoring of corridors, slopes and works sites.
  • AI-driven digital site supervision for public works.

See our solutions

Engineers and government staff in hard hats and high-visibility vests inspect a scaffolded hillside on a Hong Kong works site

Where we work

On the ground in Asia and the Middle East.

Kodifly has entities in Hong Kong, Singapore and Saudi Arabia, so you work with a local company in your own market and your own time zone.

  • Hong KongHeadquarters

    Engineering, product and AI, based at Hong Kong Science Park.

  • SingaporeSoutheast Asia

    Our Singapore entity, serving clients across Southeast Asia.

  • Saudi ArabiaMiddle East

    Our Saudi entity, serving clients in the Kingdom and the wider Gulf.

Talk to our regional team

100+
sites with Kodifly systems implemented.
10
markets across Asia, the Middle East and Europe.

Guides for public works teams.

Plain-English explainers on the circulars and systems behind Hong Kong public works.

  • DEVB TC(W) No. 8/2025 explained

    DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.

  • How to choose a DWSS

    How to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.

  • 4S and DWSS integration: one hub for site safety data

    How the 4S centralised management platform joins the DWSS Smart Construction Management hub under DEVB TC(W) Nos. 3/2023 and 8/2025, and what flows into it.

Latest from Kodifly.

See what our AI makes of your site.

Send us two walks of the same site and we will return a sample AI report, drafted by SpatialSense AI for your site. Prefer to talk first? Choose a demo below.